My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55708
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:41 PM
Creation date
11/23/2007 10:42:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
8/16/2002
Doc Name
Decision Memo
From
Forest Service
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Impermeable ground cloths will be used under the drill rigs and petroleum product <br />containers to reduce potential for petroleum spills. Drill rigs will be fueled using a <br />siphon hose. <br />13. Only traffic associated with drilling and monitoring activities will be allowed on the <br />road from BRL's private land orito the National Forest. No other BRL traffic will be <br />permitted. The Forest Service reserves the right to use this access for inspection <br />purposes, <br />14. BRL will be responsible for installing cattle guazds at specified locations if directed <br />by the Forest Service. <br />l5. Gob ventilation boreholes and access needs will need to be permitted under a Special <br />Use Permit from the Forest Service. <br />16. Improvement of the Hubbazd Canyon trail will be afforded using a Sweco 450 trail <br />dozer (or equivalent} with a blade width not to exceed 60 inches. The pail improvement <br />will be done according to Forest Service specifications for trails, and will include <br />installation of proper drainage structures and sediment control features to prevent <br />resource damage. Improvements will only be allowed along the existing trail alignment. <br />17. The final alignments of temporary roads and drill pads will be approved in the field <br />by the Forest Service prior to ground disturbance occumng. <br />18. BRL will be required to monitor emissions from the GVB and report the findings to <br />the Forest Service. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.