Laserfiche WebLink
~..t ~noe.~ re~e <br />• <br />Golds- Associates Ine. <br />200 Color. Boulevard. Suite 500 <br />tnkewood. CO USA 80228 <br />Telenhonei303)9B0-OSdO <br />Fcx(3C3)9B5-2080 <br />August 18, 1995 <br />Cripple Creek ~ Victor Gold Mining Company <br />2755 State Highway 67 <br />Victor, CO 80860 <br /> <br /> <br />Our Ref.: 953-2900.007 <br />RE: STLIBBED T PRIMARY UNDERDRAL~' ENFLANCE.'1~NT <br />Dear John: <br />Golder Associates Inc. (Golder) would like to take this opportunity to discuss the <br />enhancements that have been incorporated to the "stubbed T" Primary Underdrain detail <br />for the Phase II Heap Leach Pad (Pad). <br />The stubbed T Primary tnderdrain constructed beneath the Phase I Pad during 1994 <br />consisted of a 24 inch diameter SDR 17 HDPE pipe (24 inch HDPE pipe), a 24 inch <br />diameter Highway Grade POPE pipe (24 inch PCPE pipe), and a 4 inch diameter SDR 17 <br />HDPE pipe (4 inch HDPE pipe), placed in trench excavated 3 feet deep by 6 feet wide and <br />bedded in Underdrain Pipe Backfill material (3/4 inch minus material). Underdrain Fill <br />(12 inch minus) was then placed above the pipe trench, with a minimum cross sectional <br />azea of 40 square feet. A minimum of 6 inches of Select Structural Fill was placed over <br />the Underdrain Fill, and overlain with the Underdrain geosynthetics. <br />During 1995 construction, it will be required that the "stubbed-T" Underdrain will be <br />constructed along the Phase II Draw. However, for the stubbed T Primary Underdrain <br />constructed for Phase II, only the 24 inch PCPE pipe will have to be installed and bedded <br />in Underdrain Pipe Backfill. Therefore, the pipe trench dimension will be 4 feet wide, by <br />3 feet deep to reflect change in number of pipes to be installed as part of the underdrain <br />system. In addition, the Underdrain Fill would be placed 3 feet deep by 15 feet wide, <br />which exczeds the 40 square foot cross sectional area criteria for the Underdrain Fill. This <br />is illustrated in the attached detail. <br />To summarize, the enhancement does not effect the integrity or intent of the underdrain, <br />since it relates only to the piping and flow capacity required for the Phase II Pad area. <br />,..~,,..~,.,.,,~..,,:,. ,-.,,..., ,.~~ ...............m,,..,.,,..,~,.~.~,,,~,-~,.,,,.,,..,..,. ~.~.,~~~.,,rr~ <br />