Laserfiche WebLink
Stip # Description Status <br />13 Survey staff gages adjacent to alluvial wells Active- <br /> Awaiting <br /> submittal for <br /> July, 1991 <br />14 Species diversity standard Terminated <br /> 2/6/87 <br />15 Drainage designs for Fish Creek borehole - Terminated <br /> The permittee will submit modified drainage 2/92 <br /> designs for the Fish Creek borehole shaft at <br /> least three (3) months prior to construction of <br /> the facility. The designs must be approved by <br /> MLRD in writing prior to any construction <br /> activities at the site. <br />16 Mine Plan Map with subsidence monuments Complied With <br /> 4/27/87 <br />17 Road control plan Terminated <br /> 2/6/87 <br />18 Monitoring well 006-87-1 needs BLM license Complied With <br /> prior to drilling 10/8/87 <br />19 Relocation of substation road to new location Complied With <br /> along fence 10/19/88 <br />20 Spoil material to pack culverts and addition of Forgiven <br /> culvert along D-2 8/8/89 <br />21 Submit revised pages and maps associated with Complied With <br /> addition of Guard Shack 7/26/89 <br />22 Drainage control at Fish Creek borehole Complied With <br /> 8/1/89 <br /> MR-34 <br />23 Submit revised pages/maps for MR-35 Complied With <br /> 8/23/89 <br />24 Drainage control at the TCC entrance Complied With <br /> 7/5/90 <br /> MR-45 <br />25 Submit maps and pages for location change Complied With <br /> for Ditch D-5 3/6/91 <br />26 Add 100' to vent acczss rcad Complied With <br />1/30/92 <br /> <br />