Laserfiche WebLink
Stip k Description Status <br />27 TCC must perform constant monitoring of Future <br />all inflow or seepage encountered as the <br />lst,2nd, and 3rd left gate roads are <br />advanced.TCC must report any encountered <br />measurable inflows to the Division immediately, <br />and shall keep the Division appraised of any <br />changes of inflow. Monitoring of inflows <br />shall continue until the Division approves cessation. <br />28 In the event that total accumulated inflow Future <br />from the gate road extensions were to reach or <br />exceed 50 gallons per minute, TCC will cease <br />further mining and seal the areas of inflow, <br />until installation of the alluvial wells and <br />stream gages is completed and initial <br />monitoring accomplished. In the event that <br />installation of seals becomes necessary, TCC <br />shall inform the Division of its proposed <br />methodology in order to obtain approval before <br />commencing the installation of the monitoring <br />facilities, TCC must obtain approval from the <br />Division prior to resuming gate road extension. <br />29 TCC will submit proposed locations and Future <br />descriptions of the alluvial wells and stream <br />gaging stations to be installed, and a schedule <br />for their installation, to the Division for <br />approval within two weeks after approval of <br />MR-91-69. <br />Commitments <br />1 Subsidence monitoring report Active/ <br />Up-to-date on <br />compliance <br />2 Sagegrouse LEK monitoring of Forgiven <br />Hudspeth Complex 4/7/88 <br />3 Hydro Monitoring Date Terminated <br />2/1/90 <br />-3- <br />