Laserfiche WebLink
~EC/East Pit Coal Reclamation Projec• <br />RN-MINES-322 <br />BID SCHEDULE <br /> Unit <br />Item Description Qty Unit Price Amoun <br />1 Mobilization and demobilization 1 Job N/A $ <br />2 Chen's Hill Reduction 1 Job N/A $ <br />3 Chen's Hill Drainage Control <br /> a) With ripnp ~ 100 Ln. Ft. $_ $ <br /> b) Without riprap 1300 Ln. Ft $_ $ <br />4 Chen's Hill Topsoil Replacement 1 Job N/A $ <br />5 West Slope Reduction 1 Job N/A $ <br />6 West Slope Drainage Control <br /> a) Wrth riprap 100 Ln. Ft. $_ $ <br /> b) Without riprap 600 Ln. Ft. $_ $ <br />7 West Slope Topsoil Replacement 1 Job N/A $ <br />8 North End BacldYll and Grading 1 Job N/A $ <br />9 North End Topsoil Replacement 1 Job N/A $ <br />10 East Pit Bacld'ill from West to East 1 Job N/A $ <br /> East Pit Slope Reduction from East to <br />11 West 1 Job N/A $ <br />12 East Pit Channel Reconstruction <br /> a) With erosion mat 100 Ln. Ft. $_ $ <br /> b) With erosion mat & riprap 250 Ln. Ft. $_ $ <br /> c) Without erosion mat 2200 Ln. Ft. $_ $ <br />13 East Fit Topsoil Replacement 1 Job N/A $ <br />14 Revegetatioo <br /> a) Fertilizer 75 Acres $_ $ <br /> b) Seeding 75 Acres $_ $ <br /> c) Mulching and crimping 75 Acres $_ $ <br />15 CAT D-8L Bulldozer, with operator, <br /> or Equivalent. Offering FHP 16 Hours $_ $ <br />16 CAT 621 E Scraper, with operator, <br /> or equivalent. Offermg _FHP 16 Hours $_ $ <br />GRAND TOTAL <br /> <br />mvc e:\wp31\p~ojecU\aCLbid~6.lab <br />Page 1 of 1 Page <br />