Laserfiche WebLink
a, <br />Table 2 -Summary of History of Permit C-91-078 <br />Date Permit Action <br />2/10/92 Permit C-91-078 approved <br />3/92 Mining operations begin <br />7/93 Mining operations end when coal contract with Nucla <br />' <br /> Power Plant is not renewed, reclamation be <br />1994 Phase I bond release (SL-Ol) approved for entire site <br />2/18/97 Proposed decision issued to approve Permit Renewal RN- <br /> O1 <br />2/27/02 Proposed decision issued to approve Permit Renewal RN- <br /> 02 <br />Revisions to Permit <br />The permit has not been revised since the last permit renewal (RN-02). <br />Violations <br />No violations have been issued since the last permit renewal (RN-02). <br />Permit Stipulations <br />Permit C-91-078 has no active stipulations. No stipulations have been terminated since the last <br />permit renewal. <br />Bond <br />As of August 9, 2004, the Division estimates reclamation liability at the Hamilton Mine is <br />less than $100,000. This amount is sufficient to assure completion of the remaining <br />reclamation work at the site if the work had to be performed by the Division, including the <br />cost of re-establishing vegetation on any revegetated azeas, should those azeas fail. The <br />permittee currently has on deposit with the Division a letter of credit bond in the amount of <br />$152,774. There is adequate bond on deposit. <br />Hamilton Mine Page 4 August 9, 2004 <br />Midterm Review <br />