Laserfiche WebLink
place all geotechnical monitoring site locations on this map, as well as on the "Geotechnical <br />monitoring Dewatering Wells" map. Please also locate the Tri-State powerline and the <br />Trapper Mine permit boundary on this map. <br />RESPONSE: Trapper will provide this information to you no later than <br />December 8, 2006. <br />11. Please identify the azeal extent of the slide on a copy of the I,/ML roof structwe contour map. <br />RESPONSE: Trapper will provide this information to you no later than <br />December 8, 2006. <br />12. As a reminder, we had asked in our letter of October 20, 2006 for receipt of any photographs <br />obtained, and any maps generated as a result oi; an aerial survey of the mine site that was to <br />have been conducted by TMI on October 13, 2006. Please provide these materials as soon as <br />possible. <br />RESPONSE: Aero-Graphics is conducting this aerial survey. Its <br />work has not been completed. We will provide you the results of this <br />work as soon as it is completed. We expect the work to be done by na <br />later than the end of the year. <br />Please call me if you have any questions or comments. We look forward to a visit with <br />you and your team as soon as it can be arranged. <br />Sincerel <br />1~f <br />orrest .Luke <br />Environmental Manager <br />c R DuBois <br />1 Mattern <br />