Laserfiche WebLink
Mr_ Dave Maxwell - 2 - July 20, 19ai <br />F-seam Mtne Plan Changes <br />Tne F-seam mine plan has peen modified slightly as follows: a small area, <br />three (3) panels, will oe mined immediately inside and to the west of the <br />F-seam porW 1s. This area underlies a portion of the approved Upper Waste <br />Pile, which is yet not Quilt. WECC also plans to cease mining in the 1W6S <br />Danes due to decreasing coal thickness. <br />An additional panel (1W3N) may oe developed north of and paralleling the <br />1 West Submains, if geological conditions allow. Tnis panel replaces a <br />parallel set of small panels previously proposed in this same portion of the <br />mine plan. Tne suosidence implications of one larger panel should be less <br />disruptive than the higner flexure resulting from repetitive barriers <br />remaining after the extraction of the group of smaller panels. <br />WECC is planning to discontinue easterly advance of the 1st East Submain, <br />oecause of odd roof conditions adjoining Sylvester Gulch. The alternative is <br />to advance a new set of East Submain Entries to the east southeast, and then <br />drive a series of nine (9) panels (lE1N through lE9N) to the east northeast. <br />Waste Disposal <br />A lower waste rack Dile was permitted in 1986 to handle 1,771,924 tons of <br />• waste over a 15.1 year period, through the year 2000. At the time of <br />permitting, WECC projected that the mine would produce approximately 110,000 <br />tons of waste Der year. Construction of the two ramps and ventilation shaft <br />for the B-seam will produce 54,000 tons of waste. This, coupled with an <br />estimate of 50,000 tons of waste associated with the 1989 mining of the <br />F-seam, will maintain the projected refuse production rate. Underground <br />development waste es projected at 105,000 tons in 1990, 50,000 tons each in <br />1991 and 1992 and 75,000 tons per year thereafter, resulting in storage in the <br />lower waste pile through 2003. <br />The ramp material is composed of alternating sandstone and shales. It has a <br />neutral pH, low salinity and a low iron content; SARs average 12.74. <br />Recommended quality standards for selenium range from 0.1-2 mg/k; <br />the ramp material averages 0.09 mg/k, at the lower end of the range. The <br />material to be generated by slope and shaft development in the B-seam is of <br />higner shear strength than the material currently contributes to the pile as a <br />result of F-seas mining, so stapility of the peie weal not be affected. <br />Suostdence Monitoring and Control <br />Wttnin the angle of draw of the B-seam mine plan area there are no renewable <br />resource lands, structures or geological hazards that require protection or <br />mitigation from subsidence. The predicted extent of subsidence to result from <br />the F-seam was approximately four (4) feet. The extent of subsidence noted <br />during the past five years has been less than two (2) feet. The predicted <br />• extent of subsidence to result from mining in the B-seam is four (4) feet for <br />room and pillar mining in porn the B and F seams. If the B-seam is mined <br />using longwall me Viods, the predicted cumulative subsidence could reach ten <br />(10) feet. <br />