Laserfiche WebLink
A. The Division proposes to approve alternative procedures for topsoil protection at <br />one location. Approval of Permit Revision No. 6 permitted a variance from <br />salvaging all of the topsoil at the train loadout coverfill stockpile. BRL will <br />salvage the top two to three inches of topsoil and then will place geotextile fabric <br />on the coverfill azea. Soil from the cut operations for the train loadout will, then, <br />be placed on top of this geotextile material. (4.06.1(2)). <br />B. The Division waived the requirement for clearing of small shrub and grass-type <br />vegetation cover prior to topsoil removal. The applicant has demonstrated that <br />inclusion of vegetation cover in salvaged topsoil is not detrimental to soil <br />productivity consistent with the post-mining land use. Large tree and shrub <br />vegetation was removed prior to topsoil salvage. <br />C. The Division has determined that the 'A' and 'B' horizons shall be removed <br />together and replaced, in order to ensure soil productivity consistent with the <br />approved post-mining land use (4.06.2(3)). <br />D. The Division has not determined that selected overburden materials shall be used <br />for or as a supplement to topsoil. (4.06.2(4)(a)). <br />V. Sealing of Drilled Holes and Underground Openings <br />A. The applicant has not proposed to manage development, exploration, drill or bore <br />holes, wells or other exposed underground openings in a manner other than by <br />sealing and plugging (4.07.1). <br />B. The Division will require that each hole, well or other underground opening be <br />capped, scaled, backfilled, or otherwise properly managed (4.07.3). <br />VI. Use of Explosives <br />A. The Division does not propose to approve a blasting area in excess of 300 acres <br />(4.08.3(2)(b)(i)). <br />B. The Division does not propose to approve blasting at times other than those <br />described in the blasting schedule (4.08.3(2)(b)(v) and 4.08.4(2)). <br />C. The applicant has not proposed to conduct blasting less than 1000 feet from a <br />school, church, hospital, or nursing facility, or less than 500 feet from disposal <br />wells, petroleum or gas storage facilities, municipal water-storage facilities, <br />fluid-transmission pipelines, gas or oil collection lines, or water or sewage lines <br />(4.08.4(7)). <br />D. The Division is not proposing to approve the use of a modified equation to <br />determine maximum weight of explosives per delay (4.08.6(2)). <br />31 <br />