Laserfiche WebLink
. _~~ <br /> <br />suspended solids are allowed to settle prior to dis- <br />charge. Monitoring of the effectiveness of this treat- <br />ment will be performed under the requirements of the <br />NPDES permit. No other water treatments are required. <br />(d) Circumstances surrounding the temporary cessation of <br />operations is associated with a change in the personnel <br />actually carrying out the work from an independent <br />contractor to NCEC's owtt work force. It is estimated <br />that the technical and economical evaluations and the <br />acquisition of equipment and materials to carry out this <br />work will exceed thirty (30) days. The exact schedule <br />for resuming operations is not known at this time but <br />will be provided as soon as it is available. <br />cc: Mr. Mark Bean <br />