Laserfiche WebLink
Original Current <br />Stip No. 1 Stipulation Status <br /> <br />6 DURING RECLAMATION OPERATIONS, THE OPERATOR MUST Future <br /> SALVAGE AND REPLACE ALL AVAILABLE TOPSOIL. IF AT <br /> LEAST SIX INCHES OF MATERIAL IS NOT AVAILABLE FOR <br /> REPLACEMENT, THE PERMITTEE MUST OBTAIN ENOUGH <br /> ADDITIONAL SUITABLE SOIL MATERIAL FOR REVEGETATION <br /> PURPOSES TO PROVIDE A TOPSOIL DEPTH OF AT LEAST SIX <br /> INCHES ON ALL DISTRUBED AREAS OF THE FEDERAL LEASE <br /> <br />- MINE PERMIT AREA. <br />- <br />7 THE PERMITTEE MUST PROVIDE FOR ADEQUATE STABILIZATION Complied With <br /> OF THE STEEPER SLOPES DURING THE FIRST YEAR OF <br /> RECLAMATION. THE PLAN MUST BE APPROVED BY THE <br /> DIVISION WITHIN 90 DAYS AFTER THE FIRST SURFACE <br /> DISTURBANCE WITHIN THE FEDERAL LEASE AREA. <br />8 AT LEAST 60 DAYS PRIOR TO USE OF HERBICIDES OR Future <br /> PESTICIDES THE PERMITTEE SHALL SUBMIT A PLAN FOR THE <br /> USE OF SUCH CHEMICALS, INCLUDING AT LEAST RATE AND <br /> METHOD OF APPLICATION, ANO THE SPECIFIC HERBICIDE <br /> AND/OR PESTICIDE TO BE USED. THE PERMITTEE MUST <br /> RECEIVE WRITTEN DIVISION APPROVAL PRIOR TO THE USE <br /> OF ANY HERBICIDE OR PESTICIDE. <br />9 THE PERMITTEE SHALL CONTINUE TO CONSULT WITH Complied With <br /> COLORADO DIVISION OF WILDLIFE PERSONNEL (LOCAL <br /> DISTRICT WILDLIFE MANAGER OR AREA SUPERVISOR, <br /> DURANGOI, AND NOTIFY THEM PRIOR TO ANY CHANGES IN <br /> BLASTING OPERATIONS WHICH MIGHT INCREASE NOISE LEVELS <br /> OR SEISMIC SHOCK LEVELS. <br /> ANY CHANGES IN BLASTING OPERATIONS WHICH MIGHT <br /> INCREASE NOISE LEVELS OR SEISMIC SHOCK LEVELS SHALL <br /> BE APPROVED BY THE DIVISION PRIOR TO THE <br /> IMPLEMENTATION OF SUCH CHANGES. SUCH APPROVAL BY <br /> THE DIVISION WILL BE GRANTED ONLY AFTER CONSULTATION <br /> WITH AND APPROVAL BY THE APPROPRIATE COLORADO <br /> DIVISION OF WILDLIFE PERSONNEL. <br />10 THE DIVISION DIRECTS THE PERMITTEE TO VARIFY 7HE Complied With <br /> ACCURACY OF THE OVERBURDEN/INTERBURDEN SWELL FACTOR <br /> AND BULKING PROJECTIONS FOR THE MARTINEZ STRIP. IN <br /> ORDER TO ACCOMPLISH THIS VERIFICATION, THE PERMITTEE <br /> SHALL COMPLETE AN ANNUAL SURVEY OF THE DISTURBED AREA. <br /> THE COMPANY SHALL UTILIZE STANDARD AERIAL OR FIELD <br /> SURVEY TECHNIpUES IN COMPLETING THE REQUIRED <br /> SURVEY. THE SURVEY MAP AND A REPORT ANALYZING <br /> CONFORMANCE WITH THE AMENDED POST-MINING TOPOGRAPHY <br /> SHALL BE SUBMITTED ANNUALLY TO THE DIVISION. <br />-8- <br />