My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54908
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:02 PM
Creation date
11/23/2007 9:55:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
2/5/1991
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Original Current <br />Stip No. 1 Stipulation Status <br /> <br /> THE PERMITTEE MUST SUBMIT THE RESULTS OF THE ABOVE <br />_.._... ._MONITORING PROGRAM TO THE DIVISION SEMI-ANNUALLY. <br />2r PRIOR TO ANY AUGER MINING THE PERMITTEE MUST Complied With <br /> DEMONSTRATE TO THE DIVISION'S SATISFACTION THE <br /> CAPABILITY TO HANDLE ANY PIT WATER WHICH IS <br /> ENCOUNTERED. IF THIS DEMONSTRATION INCLUDES A <br /> PROPOSAL TO DISCHARGE PIT WATER, THE PERMITTEE MUST <br /> PROVIDE THE DIVISION WITH A COPY OF A CURRENT NPDES <br /> DISCHARGE PERMIT ALLOWING SUCH DISCHARGES. <br />3 WITHIN 120 DAYS OF ISSUANCE OF THE PERMIT REVISION, Complied With <br /> THE OPERATOR SHALL DESIGN AND CONSTRUCT A MECHANISM <br /> FOR DEWATERING THE SEDIMENTATION FACILITIES WHICH <br /> WILL MEET THE REQUIREMENTS OF THE DIVISION'S <br /> REGULATIONS. SUCH DESIGNS SHALL BE FORWARDED TO AND <br /> APPROVED BY THE DIVISION PRIOR TO CONSTRUCTION. <br />3r ADDITIONAL GEOTECHNICAL EXAMINATION AND ANALYSIS Complied With <br /> BE COMPLETED, AND DIVISION AND COLORADO DEPARTMENT OF <br /> HIGHWAYS APPROVALS AQUIRED, FOR THE REMAINING <br /> SOUTHEREASTERN TWO THIRDS OF THE HIGHWALL, PRIOR TO <br /> THE COMMENCEMENT OF AUGERING WITHIN THAT ADDITIONAL <br /> AREA. <br />4 THE OPERATOR SHALL SUBMIT A PLAN TO THE DIVISION TO Complied With <br /> CONTROL THE EROSIVE VELOCITIES OF ALL DRAINAGE <br /> DITCHES WITHIN THE FEDERAL LEASE PERMIT REVISION AREA <br /> WITH DESIGN VELOCITIES IN EXCESS OF 5 FEET PER <br /> SECOND WITHIN 90 DAYS OF PERMIT ISSUANCE. <br />5 THE SURFACE WATER MONITORING PROGRAM WILL INCLUDE THE Terminated <br /> FOLLOWING MONITORING FREQUENCY AND ALL WATER ANALYSES to be <br /> WILL BE PERFORMED USING THE PARAMETERS LISTED BELOW: replaced by <br /> MONITORING SITE FLOW MEASUREMENT WATER SAMPLING TR24 <br /> DESIGNATION FREQUENCY <br />FREOl1ENCY <br /> _ <br />MON H OUART~RLY- <br /> S2 MONTHLY QUARTERLY <br /> S3 MONTHLY QUARTERLY <br /> REQUIRED PARAMETERS <br /> pH (FIELD) SULFATE <br /> CONDUCTIVITY AT 25 C (FIELD) ALUMINUM <br /> TOTAL DISSOLVED SOLIDS IRON <br /> TOTAL SUSPENDED SOLIDS MANGANESE <br /> OIL AND GREASE ZINC <br /> SODIUM ADSORPTION RATIO CALCIUM <br /> BICARBONATE NITRATE <br /> MAGNESIUM SODIUM <br /> RESULTS OF THE MONITORING PROGRAM MUST BE SUBMITTED TO <br /> THE DIVISION SEMI-ANNUALLY. <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.