Phase II was originally estimated at 14.5 acres and in 2004 we received a technical <br />revision (TR-1) for a staging area of 6.92 acres We now need to increase our bond <br />for the other 7.58 acres to mine in Phase II. We estimate 3-5 years to extract out the <br />material in this 7.58 acres. Since the bond is in place for the stockpile area we are <br />only submitting numbers for the 7.58 acres: <br />ITEM NO DESCRIPTION <br />QUANTITY UNIT <br />UNIT RATE AMOUNT <br />RIP PIT FLOOR FOR <br />1 COMPACTION <br />2 SPREAD TOPSOIL <br />3"THICK <br />3 SEEDING <br />SUBTOTAL <br />ADD OVERHEAD & PROFIT <br />TOTAL <br />7.58 ACRES <br />7.58 ACRES <br />3057 CUBIC <br />YARD <br />200.00 1,516.00 <br />2.75 8,406.75 <br />7.58 ACRES 600.00 4,548.00 <br />14,470.75 <br />0.10 1,447.06 <br />15,917.83 <br />The equipment that might be used for reclamation will be a dozer, paddle wheel <br />scraper, motor grader, tractor and box scraper, and a broadcast seeder. <br />If additional information is needed, please advise. <br />Sincerely, <br />Asphalt Constructors, Inc. <br />Edward J. Roberts <br />Secretary/Controller <br />