Laserfiche WebLink
' Table 9: MofTat Area Block 8 Erosion Condition Classification <br /> Possible <br />1 <br />Item Score 2000 1999 1998 1997 1996 1995 <br />Soil Movement 14 0 0 0 3 3 8 <br />' Surface Litter 14 0 0 0 3 3 3 <br />Surface Rock Fragments 14 0 0 0 0 0 2 <br />Pedestalling 14 0 0 0 0 0 0 <br />Flow Patterns 15 0 0 0 3 6 12 <br />Ri11s 14 1 6 6 8 8 9 <br />Gullies 15 1 3 3 6 4 9 <br />' <br />Total 100 2 9 9 25 24 43 <br />Erosion Condition Classi fication: Stable Stable Stable Slight Slight Mod. <br />' Block 9 <br />The erosion condition composite SSF score for this site was 6, which places it in the <br />Stable erosion class. The tabulated results for this survey are shown in Table 10. The spoil <br />' <br />springs and seeps in this block have formed a system of small drainage channels. These ch annels <br />continue to stabilize wit h armored bottoms and increased vegetatio n along the channel edges. <br />No corrective measures a re planned as a result of the inve ntory. <br />Table 10: Moffat Area Block 9 Erosion Condition Classification <br />' Possible <br />Item Score 2000 1999 1998 1997 1996 1995 <br />' <br />Soil Movement 14 0 0 0 3 5 5 <br />Surface Litter 14 0 0 0 3 0 6 <br />' Surface Rock Fragments <br />Pedestalling 14 <br />14 0 <br />0 0 <br />0 0 <br />0 3 <br />0 5 <br />0 2 <br />0 <br />Flow Patterns 15 0 0 0 3 5 9 <br />Rills 14 3 3 3 6 6 9 <br />' <br />Gullies 15 3 3 3 6 9 6 <br />Total 100 6 6 6 24 30 37 <br />' Erosion Condition Classi fication: Stable Stable Stable Slight Slight Slight <br />Block ]0 <br />The erosion condition composite SSF score for this area was 12, which placed it in the <br />Stable erosion class. The tabulated results for this survey are shown in Table 11. The area was <br />' seeded in late 1996. Several gullies connecting to the final pit drainage channel existed in the <br />block. The gullies originally resulted from late summer storm activity in 1997. The gullies were <br />repaired and seeded in 1998. Vegetation has been slow to reestablish with minor gullies <br />' beginning to reform. Corrective measures planned as a result of the inventory include roughing- <br />up and seeding the new gully activity. <br />8 <br />