Laserfiche WebLink
• Repair of single gully on northern portion of Block (1994). <br />• A portion of the northern section of Block received interseeding in 1995 as described in the <br />' 1995 Annual Reclamation Report. <br />Block 2 contains live-handled roto-cleared topsoil that was seeded in the spring of 1993. <br />' • 1995 -Gully shaped and matted, Downdrain 3. <br />1998 -Downdrain 3 was reconstructed and riprapped. <br />' Block 3 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1996 -Lower slope area redisturbed to blend into Lower Moffat Road; gullies in redisturbed <br />' area repaired and reseeded during the reshaping activity. <br />Block 4 contains live-handled roto-cleared topsoil (1993) and was not seeded [o further the trial <br />' area started with Block 1. <br />• 1995 - At midpoint of Block, a portion was interseeded and livestock imprinted. <br />' • 1996 -Gully repair and reseeding on lower slopes at midpoint of block where previous <br />livestock imprinting efforts where considered insufficient. <br />' Block 5 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1995 -Gullies repaired in conjunction with construction of Downdrain 1. <br />' Block 6 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />1996 -Gully repaired and reseeded on lower slope. <br />' • 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />' Block 7 contains live-handled roto-cleazed topsoil (1994) that was not seeded as part of the test <br />practice employed in Blocks 1 and 4. <br />• 1995 -Gully repaired and reseeded on lower slope. <br />Block 8 contains live-handled roto-cleared topsoil (1994) and was seeded in (1995). <br />• 1997 -Gully repaired and reseeded on lower slope south of downdrain 4. <br />' Block 9 contains live-handled roto-cleared topsoil (1994) and was seeded in 1995. <br />' • 1996 -Gullies along the lower slope repaired and reseeded. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />Block ]0 contains stockpiled topsoil (1996) and was seeded in 1996. This block was also <br />contour furrowed. <br />' • 1997 -Several gullies were repaired and reseeded at various locations in this block. Areas <br />included: the northwestern most edge; the central upper and lower portion of the block where <br />gully drainage entered into the Moffat final pit drainage channel; along Downdrain 4 where a <br />3 <br />