Laserfiche WebLink
Stipulation No. 59 <br />MOUNTAIN COAL COMPANY WILL CONTINUE TO WORK WITH THE DIVISION TO FINALIZE AN <br />APPROPRIATE BOND AMOUNT IN A TIMELY tv1ANNER. BOND AMOUNT FINALIZATION WILL <br />PROCEED IN ACCORDANCE WITH THE REQUIREtv1ENTS OF 3.02.2(4. <br />STATUS: Future <br />Stipulation No. 60 <br />Mountain Coal company will submit a revised Exhibit 51 Figure 2.0 G (or equivalent figure) to <br />accurately depict lower refuse pile -topsoil pile locations and volumes, no later than December <br />31, 1996. <br />STATUS: Complied with by submission of Minor Revision 204, 01/02/97. <br />Stipulation No. 61 <br />The disturbance proposed for Permit Revision No. 7 shall not begin until the Division has <br />received United States Fish and wildlife Service concurrence for this project. <br />STATUS: Complied with 5/30/97. <br />Stipulation No. 62 <br />Mountain Coal Company shall provide documentation which verifies that the United States <br />Forest Service does not manage any lands within the proposed disturbed area associated with <br />permit revision no. 7. <br />STATUS: Complied with 5/12/97. <br />Stipulation No. 63 <br />Disturbance associated with Technical Revision No. 79, which is proposed to occur within 100 <br />feet of [he highway right-of--way, shall not occur until [he Division has received documentation <br />of the Colorado Department of Transportation approval for such disturbance. <br />STATUS: Complied with by submittal of Minor Revision 215, 05/15/97. <br />Stipulation No. 64 <br />The Division approves minor revision No. 221 as a temporary measure to ensure that the <br />Sylvester Gulch channel remains open to convey flow. The Division directs Mountain Coal <br />