Laserfiche WebLink
TR-84 Landslide corrective measures approved 12/23/98 <br />TR-85 Change in hydrologic monitoring program approved 07/21 /98 <br />TR-86 As-built information for Sylvester Gulch facilities pending <br />TR-87 As-built information for run-of--mine pad expansion pending <br />Minor Revisions <br />MR 178 Non-coal waste disposal approved 02/27/96 <br />MR 179 Shop addition approved 03/12/96 <br />MR 180 Concrete barriers approved 03/12/96 <br />MR 181 Revision of designs for ditch D2-71 and culvert C2-10 approved 04/04/96 <br />MR 182 Permit renewal page incorporation approved 04/05/96 <br />MR 183 Exploration drilling approved with <br /> conditions 06/19/96 <br />MR 184 Soil borings and water level holes approved 04/10/96 <br />MR 185 Construct a rock buttress and french drain, approved 05/14/96 <br />MR 186 Install culvert at spillway of pond MB-I approved 05/23/96 <br />MR 187 Conduct exploratory drilling approved 07/25/96 <br />MR 188 Haul and access road certifications approved 06/19/96 <br />MR 189 Exploratory drilling and soil investigation approved 07/10/96 <br />MR 190 Refuse pile topsoil/subsoil plan approved 08/06/96 <br />MR 191 Install two french drains approved 08/01/96 <br />MR 192 Concrete Floor in MSB building and rcc surface approved 09/09/96 <br />MR 193 Construct concrete aprons at silo 2 approved 09/06/96 <br />MR 194 Expand parking lot approved 08/30/96 <br />MR 195 Expand and upgrade waste water treatment plant approved 09/23/96 <br />MR 196 Revise B-seam mine plan approved 11/21/96 <br />MR 197 Revise map of lower refuse pile topsoil/subsoil piles approved with <br /> conditions 10/02/96 <br />MR 198 Expand bathhouse facility approved 10/11/96 <br />MR 199 Replace propane tank approved 10/2 ] /96 <br />MR 200 Relocate power line approved 11/01/96 <br />MR 201 Install decant pipes on pond MB-1 approved 10/25/96 <br />MR 202 Install monitoring wells and exploratory drilling approved 12/12/96 <br />MR 203 Install Jersey barriers at materials storage bench approved 12/17/96 <br />MR 204 Update figure 2.06 in Exhibit 51 approved 01/02/97 <br />MR 205 Construct small building approved 01/23/97 <br />MR 206 Stability analysis approved Ol/22/97 <br />MR 207 Install boreholes for geotechnical analysis approved 02/18/97 <br />MR 208 Update mine water inflow information approved 01/21/98 <br />MR 209 Install mine water discharge pipe in Lone Pine Gulch partially approved <br />MR 210 Geotechnical investigations in Sylvester Gulch approved 03/24/97 <br />MR 211 Road access change for geotechnical investigations approved 03/04/97 <br />MR 212 Install dewatering boreholes approved 05/05/97 <br />MR 21 3 Update surface owners approved 05/12/97 <br />