My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54582
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:48 PM
Creation date
11/23/2007 9:39:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
3/3/1999
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />renewal application on January 30, 199 L The permit was subsequently issued on January 29, <br />1993 and was renewed on July 30, 1996. <br />The midterm date for this five-year permit term is January 31, 1999. This Midterm Review was <br />initiated in early January of 1999. <br />Since permit renewal, seven Notices of Violation (NOV) were issued. <br />NOV C-96-013 was issued on June 12, 1996, for failure to properly handle topsoil at the lower <br />refuse pile. The violation was terminated on August 6, 1996, and a penalty of $1000.00 paid on <br />December 12, 1996. <br />On July 25, 1997, NOV C-97-008 was issued for failure to protect the hydrologic balance, and <br />failure to segregate topsoil and subsoil from other materials. The violation was terminated on <br />August 25, 1997, and a penalty of $1000.00 paid on January 13, 1998. <br />Also on July 25, 1997, , NOV C-97-009 was issued for failure construct ahaul/access road in a <br />stable manner to prevent damage to the stream channel and failure to adhere to permitting <br />commitments for a stream buffer zone. This violation was finally terminated on October I5, <br />1998. The penalty of $1250.00 was paid on January 13, 1998. <br />NOV C-97-OIU was issued July 30, 1997, for failure to obtain regulatory approval for mine site <br />construction activities in previously undisturbed areas. This violation was terminated on August <br />25, 1997, and the penalty of $1000.00 was paid on January 13, 1998. <br />NOV C-97-022 was issued on November 20, 1997, for offsite hydrologic and landslide impacts. <br />This violation was subsequently vacated. <br />On October 16, 1998, NOV C-98-009 was issued for failure to contain mining operations <br />within the permit area. Upon clazification of the permit boundary, this was also vacated. <br />SECTION 1[ -REVISIONS TO THE PERMIT <br />The following minor and technical revisions have been processed since the permit renewal <br />completed in January 29, 1993: <br />Technical Revisions <br />TR 78 Reconfigure lower refuse pile approved 05/20/96 <br />TR 79 Construction of refuse pile expansion azea approved with <br /> conditions 05/13/97 <br />TR 80 Update of Probable Hydrologic Consequences pending <br />TR 81 Designs for Lone Pine mine water treatment plant approved 10/29/97 <br />TR-82 Improvements at train loadout approved 08/03/98 <br />TR-83 Mine dewatering and treatment facilities approved 02/27/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.