My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54560
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:47 PM
Creation date
11/23/2007 9:38:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
12/18/1992
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SLOPES OR EXISTING MOVEMENT ZONES, BLUE RIBBON COAL COMPANY SHALL COMPLY <br />WITH RECOMMENDATIONS PERTAINING TO REQUIRED SLOPE TREATMENT INCLUDED IN <br />THE FORTHCOMING HAUL ROAD STUDY. THE REQUIRED FIELD WORK, THE ABOVE- <br />MENTIONED MAP, AND A REPORT DEFINING CORRECTIVE MEASURES, IF SLOPE <br />TREATMENT IS REQUIRED, SHALL BE SUBMITTED TO THE DIVISION FOR APPROVAL <br />WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Status: Complied with January 10, 1983. <br />Stipulation 2 <br />BLUE RIBBON COAL COMPANY SHALL REVISE EXHIBIT F OR OTHERWISE AMEND THE <br />PERMIT APPLICATION TO ENSURE PROTECTION OF ESTABLISHED RIPARIAN <br />VEGETATION ADJACENT TO POND 1. A REVISED EXHIBIT F OR OTHER AMENDMENT <br />DEMONSTRATING PROTECTION OF THE RIPARIAN HABITAT MUST BE SUBMITTED TO THE <br />DIVISION WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Status: Forgiven September 24, 1984. <br />Stipulation 3 <br />BLUE RIBBON COAL COMPANY SHALL PROVIDE AN ACCEPTABLE STABILITY ANALYSIS <br />OF THE PROPOSED BACKFILLED CONFIGURATION OF ALL MINE FACILITIES AND THE <br />HAUL ROAD, INCLUDING AN APPROPRIATE MATERIAL SHEAR STRENGTH TESTING <br />REPORT. THIS STABILITY ANALYSIS SHALL DEMONSTRATE COMPLIANCE WITH THE <br />STATIC SLOPE SAFETY FACTOR REQUIREMENTS OF RULE 4.27.4(1). THIS <br />ACCEPTABLE STABILITY ANALYSIS SHALL BE SUBMITTED TO THE DIVISION WITHIN <br />60 DAYS OF PERMIT ISSUANCE. <br />Status: Complied with January 10, 1983. <br />Stipulation 4 <br />NO CONSTRUCTION SHALL COMMENCE UNTIL FINAL CONSTRUCTION DRAWINGS HAVE <br />BEEN REVIEWED AND APPROVED BY THE DIVISION. <br />Status: Complied with September 21, 1984. <br />Stipulation 5 <br />THE APPLICANT SHALL SUBMIT AN ACCEPTABLE MONITORING PROGRAM TO THE <br />DIVISION WITHIN 30 DAYS FOLLOWING APPROVAL OF THE REVISION. THIS <br />MONITORING PROGRAM SHALL INCLUDE 80TH SLOPE STABILITY MONUMENTATION AND <br />THE INSTALLATION AND MONITORING OF WATER LEVEL PIEZOMETERS, IN ORDER TO <br />VERIFY THE PORTAL BENCH'S STABILITY. TWO PIEZOMETERS SHALL BE INSTALLED <br />IN THE BENCH SUBDRAIN TO ENABLE COLLECTION AND FULL ANALYSIS OF LEACHATE <br />QUALITY TWO TIMES PER YEAR. <br />Status: Complied with April 30, 1985. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.