Laserfiche WebLink
SLOPES OR EXISTING MOVEMENT ZONES, BLUE RIBBON COAL COMPANY SHALL COMPLY <br />WITH RECOMMENDATIONS PERTAINING TO REQUIRED SLOPE TREATMENT INCLUDED IN <br />THE FORTHCOMING HAUL ROAD STUDY. THE REQUIRED FIELD WORK, THE ABOVE- <br />MENTIONED MAP, AND A REPORT DEFINING CORRECTIVE MEASURES, IF SLOPE <br />TREATMENT IS REQUIRED, SHALL BE SUBMITTED TO THE DIVISION FOR APPROVAL <br />WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Status: Complied with January 10, 1983. <br />Stipulation 2 <br />BLUE RIBBON COAL COMPANY SHALL REVISE EXHIBIT F OR OTHERWISE AMEND THE <br />PERMIT APPLICATION TO ENSURE PROTECTION OF ESTABLISHED RIPARIAN <br />VEGETATION ADJACENT TO POND 1. A REVISED EXHIBIT F OR OTHER AMENDMENT <br />DEMONSTRATING PROTECTION OF THE RIPARIAN HABITAT MUST BE SUBMITTED TO THE <br />DIVISION WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Status: Forgiven September 24, 1984. <br />Stipulation 3 <br />BLUE RIBBON COAL COMPANY SHALL PROVIDE AN ACCEPTABLE STABILITY ANALYSIS <br />OF THE PROPOSED BACKFILLED CONFIGURATION OF ALL MINE FACILITIES AND THE <br />HAUL ROAD, INCLUDING AN APPROPRIATE MATERIAL SHEAR STRENGTH TESTING <br />REPORT. THIS STABILITY ANALYSIS SHALL DEMONSTRATE COMPLIANCE WITH THE <br />STATIC SLOPE SAFETY FACTOR REQUIREMENTS OF RULE 4.27.4(1). THIS <br />ACCEPTABLE STABILITY ANALYSIS SHALL BE SUBMITTED TO THE DIVISION WITHIN <br />60 DAYS OF PERMIT ISSUANCE. <br />Status: Complied with January 10, 1983. <br />Stipulation 4 <br />NO CONSTRUCTION SHALL COMMENCE UNTIL FINAL CONSTRUCTION DRAWINGS HAVE <br />BEEN REVIEWED AND APPROVED BY THE DIVISION. <br />Status: Complied with September 21, 1984. <br />Stipulation 5 <br />THE APPLICANT SHALL SUBMIT AN ACCEPTABLE MONITORING PROGRAM TO THE <br />DIVISION WITHIN 30 DAYS FOLLOWING APPROVAL OF THE REVISION. THIS <br />MONITORING PROGRAM SHALL INCLUDE 80TH SLOPE STABILITY MONUMENTATION AND <br />THE INSTALLATION AND MONITORING OF WATER LEVEL PIEZOMETERS, IN ORDER TO <br />VERIFY THE PORTAL BENCH'S STABILITY. TWO PIEZOMETERS SHALL BE INSTALLED <br />IN THE BENCH SUBDRAIN TO ENABLE COLLECTION AND FULL ANALYSIS OF LEACHATE <br />QUALITY TWO TIMES PER YEAR. <br />Status: Complied with April 30, 1985. <br />-2- <br />