Laserfiche WebLink
The Yankee Gulch Project pipeline will be constructed consistent with the results <br />of these resource studies and the respective permit conditions/stipulations <br />defined in the Final EIS and its Conditions of Approval. Any additional required <br />studies of cultural resources, raptors, threatened and endangered plants, or <br />wetlands (e.g., for the adjusted Davis Point route) will be conducted prior to <br />pipeline construction. <br /> <br /> <br />Pipeline Plan of Clevelopment 4 <br />Yankee Gulch Sodium Mh,erals Project <br />Amerimn Soda. LLP. <br />