My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54404
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:40 PM
Creation date
11/23/2007 9:27:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985210
IBM Index Class Name
General Documents
Doc Date
4/11/1986
Doc Name
SPECIAL REVIEW FINDINGS AND RESOLUTION CONCERNING THE PETITION OF LYONS STONE QUARRIES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Review • • <br />Lyons Stone Quarries <br />Page -5- <br />the right to spot check weight on loaded trucks. <br />(5) The contractor is responsible for prompt, <br />of any material that spills onto the roadway. <br />(6) All hauling must be completed prior to end <br />year, and it is preferred that all hauling be completed prior to May 1 in <br />impact of excessive truck traffic on tourist traffic. <br />removal <br />each school <br />to limit the <br />(7) The contractor shall notify the State Highway IJ~epartment of <br />its proposed truck activity and comply with any requirements of than Department <br />regarding the impact on the intersection at State Highway 34. <br />3. The applicant shall obtain an air emissions permit for the operation (unless <br />the County Health Department determines such is not appropriate). <br />4. Conditions on reclamation: <br />a. Reclamation must begin within one year of the essation of <br />quarrying on the site, if not before. <br />b. Where possible, the reclamation shall be accomplishe in a phased <br />manner, concurrent with the mining operation. Within 90 days after the da hereof, the <br />applicant shall submit a plan for phased reclamation to County staff for app oval. In lieu <br />of such a plan, the applicant may provide written verification from the Soil onservation <br />Service that such phased reclamation is not feasible for that specific site. <br />5. Approval is given for removal of loose rock from existing rubble piles <br />within the quarry boundaries, if the applicant first receives a permit fr m the State <br />Mined Land Reclamation Board to do so. <br />6. All conditions of approval shall apply to quarry <br />employees, agents, and contractors. <br />owners, <br />7. Within 30 days after the date hereof, the perimeters of the quarry area, as <br />
The URL can be used to link to this page
Your browser does not support the video tag.