My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54374
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:39 PM
Creation date
11/23/2007 9:26:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
8/27/1993
Doc Name
MINING PERMIT (Dated 5/23/93 to 5/23/98)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIDER TO MINING PERMIT <br />Permit Date: May 23, 1993 <br />Permit No: C-82-056 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No <br />Prior to approval of any mining-related activities which would <br />potentially affect lands in the North 1/2 of Section 10, TSN, R86W or <br />the Southwest 1/4 of the Southwest 1/4 of Section 33, T6N, R86W <br />(through future permit revision or renewal) the permittee will submit <br />acceptable right-of-entry information to the Division. <br />Stipulation No. 27 <br />TCC must perform constant monitoring of all inflow or seepage <br />encountered as the first, second and third left gateroads are <br />advanced. TCC must report any encountered measurable inflows to the <br />Division immediately, and shall keep the Division apprised of any <br />changes of inflow. Monitoring of inflows shall continue until the <br />Division approves cessation. <br />Stipulation No. 28 <br />In the event that total accumulated inflow from the gateroad extensions <br />were to reach or exceed 50 gpm, TCC will cease further mining and seal <br />the areas of the inflow, until installation of the alluvial wells and <br />stream gages is completed and initial monitoring accomplished. In the <br />event that installation of seals becomes necessary, TCC Shall inform <br />the Division of its proposed methodology in order to obtain approval <br />before commencing installation. Following installation, TCC must <br />obtain approval to resume gateroad extension. <br />Stipulation No. 29 <br />TCC will submit proposed locations and descriptions of the alluvial <br />wells and stream gaging stations to be installed, and a schedule for <br />their installation, to the Division for approval within two weeks after <br />approval of MR 91-69. <br />Stipulation No. 32 <br />Twentymile Coal Company will submit to the Division upon receipt from <br />the Colorado Department of Health the approval documents for their <br />waste water treatment system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.