Laserfiche WebLink
-3- <br />III. Bonding <br />Part of the requirement for conducting a mid-term review is to determine <br />if enough bond is on file with the Division to perform reclamation if <br />necessary. During this review it was determined that some errors had <br />occurred while calculating the current bond. It was concluded that <br />Colowyo Coal did not have enough of their current established bond <br />assigned to certain reclamation tasks. However, it was determined that <br />Colowyo Coal did have enough excess bond on file with the Division to <br />more than adequately reclaim the mine site. Therefore, it was agreed <br />that during an upcoming permit revision or during the next permit <br />renewal, the details of the bond and their assignments would be clarified <br />to accurately reflect the current status of the mine. <br />8782F/scg <br />