Laserfiche WebLink
-2- <br />There is also one on-the-ground issue which will require a revision to <br />the permit. This involves several culverts and diversions on the mine <br />site which are not on the hydrology map (11 and 12) or existing <br />structures map (21) and do not contain design specifications as required <br />by Rule 2.05.3(3). This includes ditches and culverts at the coal <br />dump/truck loading facility near the pit and ditches and culverts at the <br />loadout facility. This information should be submitted as a revision on <br />or before October 1, 1990. <br />II. Summary of Revisions <br />The following is a summary of revisions which have been submitted, reviewed, <br />and approved or are pending approval since the last permit renewal. <br />Minor Revision 11 - Revise vegetation monitoring plan (submitted <br />November 23, 1987) <br />Action -Approved November 30, 1987 <br />Minor Revision 12 - Exploration drilling within permit area (submitted <br />June 5, 1989) <br />Action - Approved June 23, 1989 <br />Minor Revision 13 - Modification of groundwater monitoring (submitted <br />August 14, 1989) <br />Action - Approved August 14, 1989 <br />Minor Revision 14 - Addition of Taylor Pump holding pond as a facility <br />(submitted November 6, 1989) <br />Action - still pending a decision until operator submits a certified <br />survey of the pond. <br />Minor Revision 15 - Section 11 Small Area Exemption (submitted <br />November 6, 1989) <br />Action -Approved November 24, 1989 ~ <br />Minor Revision 16 - Streeter fill diversion maintenance (submitted <br />December 12, 1989) <br />Action -Approved December 12, 1989 <br />Technical Revision 13 - Operations office/bond area change (submitted <br />October 13, 1988) <br />Action - Approved October 27, 1988 <br />Technical Revision 14 - Mining of Section 11 (submitted November 18, 1988) <br />Action - Approved January 25, 1989 <br />Technical Revision 15 - Revise overburden monitoring (submitted <br />February 28, 1990) <br />Action - Approved April 24, 1990 <br />Technical Revision 16 - Modification to Post-Mining Topography (submitted <br />May 14, 1990) <br />Action -Approved June 18, 1990 <br />All Stipulations have been or are currently being satisfied. <br />