Laserfiche WebLink
<br />Stipulation No. 6 <br />S7 r,~ ~ THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE PILE SITE, TO SUBMIT AN APPROPRIATE AMENDMENT TO THE <br />Fu OPERATION PLAN WITHIN THE EXISTING PERMIT TO LIMIT EXTRACTION BENEATH THE <br />a ~ WASTE PILE AND WITHIN A DEFINED BUFFER ZONE TO PRIMARY DEVELOPMENT ONLY. <br />O /O ~ y~~ THE SURFACE BUFFER ZONE WILL BE DEFINED BY THE SUBSIDENCE ANGLE OF DRAW. <br /> Stipulation No. 7 <br />sT=~ ~ THE DIVISION DIRECTS (JEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />P ~ THE UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES <br />/ <br />~ sJQ1DIyb DOWNSLOPE FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. THESE TILT METER <br />' <br /> INSTALLATIONS SHALL BE INSTALLED AS SPECIFIED IN WECC <br />S AUGUST 15, 1985 <br /> SUBMITTAL. ONE INDICATOR SHALL BE INSTALLED WITHIN 160 FEET OF THE TOE <br /> OF THE WASTE PILE CURRENTLY HALF WAY BETWEEN MONUMENTS 51 AND 54. THE <br /> SECOND SHALL BE LISTED APPROPRIATELY 100 FEET NORTHEAST OF MONUMENT S2, <br /> 160 NORTH OF TOES OF THE WASTE PILE, AS INDICATED ON DRAWING N0. MG-R <br /> C-001, INCLUDED IN THE PERMIT REVISION APPLICATION. DURING THE <br /> INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR SHALL AUGER AND LOG <br /> THE SURFICIAL AND BEDROCK STATIGRAPHY ENCOUNTERED. AUGERING SHALL <br /> CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED INTACT BEDROCK OCCURRENCE. <br /> IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS ENCOUNTERED, THE <br /> OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE PRE-EXISTING SLOPE <br /> INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS DISCERNED, THE OPERATOR WILL <br /> BE REQUIRED TO APPROPRIATELY RECONFIGURE THE PILE DESIGN, PRIOR TO <br /> INITIATION OF ANY CONSTRUCTION ACTIVITY. <br />~~ Stipulation No. 8 <br />Si'~P l?J <br />SURFACE WATER AND GROUND WATER MONITORING OF THE LOWER PERMANENT <br />RL UNDERGROUND DEVELOPMENT WASTE PILE WILL INCLUDE THE CHEMICAL CONSTITUENTS <br />SELENIUM, UNIONIZED AMMONIA, AND NITRATE/NITRITE. DETERMINATION OF <br />NITRITE CONCEPTfRATION WILL BE MADE ONLY WHEN DEEMED NECESSARY BY THE <br />DIVISION. RESULTS AND INTERPRETATIONS ARE TO BE INCLUDED ON A CONTINUING <br />FOR ALL CHEMICAL CONSTITUENTS (SURFACE WATER AND GROUND WATER) MONITORED <br />OF THE IMPA TS OF THE LOWER WASTE PILE TO THE HYDROLOGIC BALANCE DURING <br />THE PREVIOUS YEAR. <br />Stipulation No. 9 <br />STOP O <br />ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE, PURSUANT TO RULE 2.04.7(1)(b), <br />MAP SHOWING THE PIEZOMETRIC SURFACE OF THE COLLUVIAL AQUIFER IN THE AREA <br />/~~, OF THE LOWER PERMANENT UNDERGROUND DEVELOPMENT WASTE PILE, IF ONE <br />DEVELOPS. <br />