Laserfiche WebLink
_ ~ <br />- <br /> <br />. <br />• iii ii <br />~ iiiiii <br /> <br />sss iiiuiii <br />* .~~- <br />.~ <br />~ <br />~ , r.-,..r ~,~ s <br />~ <br /> <br /> LIST OF STIPULATIONS <br /> Stipulation No. 1 <br />5-rc~ p <br />F(A NEITHER WEST ELK COAL COMPANY, NOR ANY SUCCEEDING OPERATOR OF THE MT. <br /> GUNNISON PROJECT'S COAL LEASES AND RESERVES WILL BE PERMITTED TO MINE <br />~.io/,ola~ COAL WITHIN THE MINNESOTA CREEK BASIN, UNTIL MLRD HAS RECEIVED A COPY OF <br /> AN ADJUDICATED PLAN OF AUGMENTATION. <br /> Stipulation No. 2 <br />ssL°U THE APPLICANT SHALL CONTINUE TO SUBMIT TD THE DIVISION, AN ANNUAL REPORT <br /> OF INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />A~ REPORT IS TO INCLUDE A MINE WORKINGS HAP SHOWING THE LOCATIOJJ AND <br /> QUANTITY OF INFLOWS, A TABLE KEYED TO THE MINE MAP WHICH SHALL CO NTAIN <br /> THE SOURCE (I.E. FAULT, FRACTURES, ETC), QUANTITY, DURATION, AND QUALITY <br /> (I.E. PH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS; A TABLE <br /> CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, CONSUMED IN THE <br /> MINE, AND IMPORTED FOR USE WITHIN THE MINE, A MAP SHOWING CURRENT WATER <br /> USES, A DISCUSSION OF THE WATER BALANCE WITHIN THE MINE, AND FINALLY A <br /> PROJECTION OF HYDROLOGIC IMPACTS OF MINING IN THE UPCOMING YEAR. THIS <br /> SHALL BE SUBMITTED NO LATER THAN FEBRUARY 1ST OF EACH YEAR. <br />Stipulation No. 3 <br />y~L°~ <br />THE OPERATOR SHALL UPON CLOSURE INSTALL WATER TIGHT SEALS WITHIN THE MINE <br />~u TO PREVENT GRAVITY DISCHARGE. THIS REQUIREMENT MAY BE WAIVED UPON THE <br />DIVISION'S APPROVAL OF A PLAN SUBMITTED BY THE OPERATOR. THIS PLAN SHALL <br />o'JO),6/a6 MINEUWORKINGSOWILLABEOOFTACCEPTABLETQUALQITYIANDOWILLEREMAINAACCEPTABLEHE <br />AFTER MINE CLOSURE. THIS SHALL INCLUDE CHEMICAL AJJALYSIS AND A <br />PREDICTIVE MODEL THAT USES OXYDATION AND REDUCTION PDTEhJTIAL TO DETERMINE <br />LONG TERM WATER QUALITY OF MINE WATERS. ALSO, THE PLAN SHALL INCLUDE THE <br />CONSTRUCTION OF A SUITABLE CHANNEL FOR MINE DISCHARGE. <br />~,t~ ~ Stioulation No. 4 <br />f ~` WHEN THE APPLICANT SUBMITS A PERMIT APPLICATION TO UNDERMINE THE DRY FORK <br />~ ~i0/„~86 OF MINNESOTA CREEK, THE SUBSIDENCE PROTECTION PLAN SHALL BE BASED UPON <br />MONITORING INFORMATION COLLECTED DURING THE EARLIER PHASES OF MINING. <br />Stipulation No. 5 <br />`+~R~ FOLLOWING STOCKPILING, TOPSOIL STOCKPILES THAT WILL NOT BE REDISTRIBUTED <br />~~ FOR FIVE OR MORE YEARS SHALL BE SEEDED WITH THE PROPOSED PERMANEtJT SEED <br />o ~~ofio/¢6 MIX (EXCLUDIIJG SHRUBS) AND NOT THE TEMPORARY SEED MIX. <br />