Laserfiche WebLink
~... <br />Ed Bischoff and Rich Domingue -2- March 2, 1982 <br />February 5, 1982 response to stipulation number 7 (number 35 in cross- <br />reference) concerning the submittal of a plan for monitoring the agricultural <br />usage and productivity of the North Fork A.V.F. A draft of this plan was <br />submitted previously, but the attached material should also be reviewed if <br />anything in the draft plan has changed. <br />RZso, stipulations 8, 9, 10 and 37 as listed in the cross-reference all deal <br />with the submittal of plans for sealing portals and wells (and boreholes). <br />As such they should be treated as a set in terms of the Division sending ARCO <br />a reply once the material has been reviewed. Roy Cox is currently reviewing <br />the plans, and once he is satisfied with the hydrologic aspects of the plan <br />we can send RRCO a letter stating that the requirements of the stipulations <br />have been satisfied. Pendleton has already reviewed the engineering design <br />aspects of the plans, and is basically satisfied (see comments on his December 28, <br />1981 memo), so all we need is Roy's o.k. and any recommendations he may have <br />concerning the plans. <br />