Laserfiche WebLink
..u ,! <br />3. We request that p~,,,,A„P^-t access for the maintenance of the river be dedicated <br />to Adams County and/or the District as part of the approval. The access <br />easement (or fee simple) should extend no less than 40-feet behind the top of <br />existing or master plan bank, whichever is farthest away from the river. <br />4. The applicant has adequately addressed the issue of temporary overburden and <br />topsoil stockpiles being placed to a maximum 20-foot height and 100-foot width <br />with 100-foot gaps between 300-foot long piles. However, the piles should be <br />placed parallel to the overbaak flow d'vectioq which many times is not paralle] to <br />the river. In additioq the piles need to be placed as far away from the channe] a8 <br />possible, rather than between the river and the pit. <br />Again, we thank you the for opportunity to review this application. We ask that the above <br />concerns and comments are considered in your final processing of this application. We <br />look forward to working with CAMAS Colorado, Inc. should they decide to pursue <br />options in the future to encroach on the 400-foot setback. If you have any questions <br />concerning any of the above, please do not hesitate to call. <br />Sincerely, <br />Bryan W. Kohlenberg, P. E. <br />Project Engineer <br />South Platte River Program <br />BWK/gb <br />ce: BiII DeGroot, UDFCD <br />Milre Refer, CAMAS Colorado, Inc. <br />Darer Duncan, Adams County <br />Craig Tessmer, Adams County Planning <br />~`br.e`~ <br />