Laserfiche WebLink
The preliminary as-built certification should be modified to address the existing cut and fill slopes <br />and the drainage configuration of Haul Roads A and B. Any modifications or additional work <br />necessary should also be documented. Please submit the revised certification by February 14, <br />1997. <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />~• <br />Erica S. Crosby <br />Environmental Protection Specialist <br />cc: Jim Burnell <br />c:\vrp51 \rrtisc\970129 <br />