Laserfiche WebLink
REVISED BID SCHEDULE (AUGUST 19, 1994) <br />HAWK'S NEST MINE BACKFILLING AND DRAINAGE CONTROL PROJECT' <br />RN-MINES-COAI~10 <br />UNIT <br />QTY UNIT PRICE AMOUNT <br />1. Mobilization/Demobilization 1 Job NA <br /> per specifications <br />2. Grading Coal/Fill Material & 1 Job NA <br /> Topsoil Replacement <br />3. Hole Abandonment (methane) 1 Job NA <br />4. Sediment Pond Removal & Drainage <br /> Channel Reconstruction <br /> a. Sediment Pond Removal 1 Job NA <br /> b. CMP-1 East Silo Area 1 Job NA <br /> c. CMP-2 Collection Box to Pond 1 Iob NA <br /> d. CMP-3 Sediment Pond 1 Job NA <br /> e. CMP-4 Sediment Pond 1 Job NA <br /> f. CMP-5 Access Road to Coal Storage 1 Job NA <br /> g. East Mine Drainage Reconstruction 1 Job NA <br />5. Revegetation 1 Job NA <br />6. ?additional Hours- Dozer CAT D-7H 20 Hrs. <br />or 215 FHP equivalent with operator, <br />if required (or other FHP) <br />7. Additional Hours- Backhoe CAT 426 10 Hrs. <br />or 70 FHP equivalent with operator, <br />if required (or other I'HP) <br />GRAND TOTAL (Enter here and on Invitation and Bid Schedule) <br /> <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 1 of 1 page <br /> <br />,~ <br />