Laserfiche WebLink
AMENDMENT NO. 1 <br />HAWK'S NEST BACKFILLING AND DRAINAGE CONTROL PROJECT <br />RN-MINES-COAL-10 <br />1. Proiect Work Specifications <br />Revised Bid Schedule (Aucxust 19. 1994) <br />hours are not guaranteed. <br />The Bid Schedule has been revised to line item the sediment <br />pond removal and drainage channel reconstruction work under <br />item 4 of the bid schedule. Item 7 has been added as <br />additional backhoe hours (Backhoe CAT 426 or 70 FHP equivalent <br />with operator, if required). Backhoe hours will be utilized to <br />scrape up the remaining coal material over the edge of the <br />natural slope at the East edge of the coal silo area. These <br />Ditch a#3 <br />material. <br />Ditch #3 located at the toe of the regraded slope shall be <br />constructed no closer than 10' from the outer limit of the <br />rail bed material. The outer edge of the top width of the <br />ditch (7.5') shall be 10' from the outer limit of the rail bed <br />Methane Hole Abandonment <br />Due to the time frame of the project and associated weather <br />conditions, the Methane Hole Abandonment work must be <br />completed prior to work located at the Coal Silo Area and East <br />Mine Area. <br />General Note <br />All bidders must write the statement "Amendment Received" <br />immediately below the Grand Total Line of the Invitation and <br />Bid Form. <br />