Laserfiche WebLink
Section V. -Bonding Summary <br />The bond was reevaluated in conjunction with Permit Renewal 04 and the subsequent <br />Minor Revisions and Technical Revisions, as detailed in Section II above. The total <br />required bond based on these revisions is $3,457,223.00. The Division currently holds a <br />corporate surety from Traveler's Casualty and Surety Company in the amount of <br />$3,586,042.00. Pursuant to Rule 3.02.2(4), the Division reevaluated the entire bond <br />during the 2006 midterm review process. The new liability is $3,610,281.00. This <br />amount is $153,058.00 less than the bond currently held by the Division. OMLLC must <br />submit a new bond or bond rider in the amount of $153,058.00 within 30 days to <br />maintain compliance with Rule 3.02.2(1). <br />This concludes the Division's 2006 Midterm Review for the Sanborn Creek and Elk <br />Creek Mines. <br />Sanborn Creek and Elk Creek Mine 2006 Mid[erm Review <br />Permit No. C-1981-022 l I April 2006 <br />