- 3- <br />6. G.E.C. AfINERALS, INC. SHALL CONSTRUCT THE PROPOSED CROSSING OF <br />NEfJLIN CREEK AS SHOWN ON DRAWING 1B WITHIN 60 DAYS OF PERMIT <br />ISSUANCE AND SHALL PROVIDE A STATEMENT THAT CONSTRUCTION MEETS <br />THE DESIGN REQUIREMENTS OF ATTACHMENT M AND DRAIJING 1B CERTIFIED <br />BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER WITHIN 30 DAYS OF <br />COMPLETED CONSTRUCTION. <br />7. PRIOR TO MINING IN THE "NORTH AREA" (AS SHO[JN ON h1AP IS OF PERPIIT <br />APPLICATION), BASELINE GROUND WATER MONITORING p1LIST BE CONDUCTED <br />AND SUBMITTED TO THE DIVISION. THE MONITORING PLAN MIST BE APPROVED <br />BY THE DIVISION PRIOR TO THE DRILLING OF THE EXPLORATION DRILL HOLES. <br />8. THE TOPSOIL SERIES OF NODEN AND TECOLOTE SANDY LOAM AiUST BE ANALYZED <br />AND THE ANALYSIS SUBMITTED TO THE DIVISION IJITHIN 90 DAYS OF PERPiIT <br />ISSUANCE. <br />9. THE TOPSOIL/SUBSOIL MASS BALANCE "fUST BE REEVALUATED, TAKING INTO <br />ACCOUNT THE DEPTHS OF SOIL SALVAGE FOR EACH PHASE OF MINING FOR EACH <br />SOIL TYPE, THE RESULTANT CUBIC YARDAGE OF MATERIAL AND THE PROPOSED <br />LOCATION FOR STOCKPILES. THE DEPTH OF SOIL TO BE REDISTRIBUTED MUST <br />THEN BE REVISED. THE REVISED TOPSOIL HANDLING PLAN PIUST BE~SUBMITTED <br />TO THE DIVISION WITHIN 120 DAYS OF PERPIIT ISSUANCE. <br />10. WITHIN ONE YEAR OF PERMIT ISSUANCE, THE APPLICANT MUST PROVIDE SITE <br />SPECIFIC BASELINE AND REFERENCF. AREA VEGETATION DATA ON SPECIES <br />COMPOSITION, COVER, PRODUCTION AND WOODY PLANT DENSITY FOR COM- <br />MUNITIES TO BE DISTURBED. THIS INFORMATION SHALL BE DERIVED FROM <br />THE SAh1PLING METHODOLOGIES PRESENT ON PAGES 2.05-36 THROUGH 2.05-38A <br />OF THE PERMIT APPLICATION AND MUST AtEF.T ESTABLISHED SAMPLE ADEQUACY <br />REQUIREMENTS. <br />11. MATERIAL BALANCE PROJECTIONS MUST BE PROVIDED FOR TE"1PORARY STOCKPILES <br />1 AND 2, THE PREVIOUSLY DISTURBED PORTIONS OF THE DRAINAGE BETWEEN A1IN- <br />ING PHASES II AND II2, AND THE DISTURBED AREA OF NE[JLIN CREEK WEST OF <br />PHASES IV AND V. IF EXCESS MATERIAL IS PROJECTED, DETAILED PLANS FOR <br />HANDLING OF THE EXCESS MATERIAL MUST BE PROPOSED. MATERIAL BALANCE <br />PROJECTIONS AND THE SPECIFIC PLANS FOR THE.F.XCESS MATERIAL, IF NEEDED,' <br />MUST BE SUBMITTED TO THE DIVISIOC] WITHIN 120 DAYS OF PERMIT ISSUANCE. <br />12. IF THE PROPERTY OWNER IJISHES TO HAVE CERTAIN COAL LOADING FACILITIES <br />REMAIN INTACT FOLLOWING COMPLETION OF MINING OPERATIONS, THEY MUST BE <br />REQUESTED IN A T,ETTI?R TO THF, DIVISION. IF TILE LETTER IS NOT RECEIVED <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, TIIE APPLICANT M11S'I' REVT.SE TIIE BOND- <br />ING ADIOUNT TO INCLUDE REMOVAL OF THESE FACILITIES. <br />13. THE HAUL ROAD AND ACCESS ROAD DESIGNS MUST BE CERTIFIED BY A PRO- <br />FESSIONAL ENGINEER WITHIN 90 DAYS PERMIT ISSUANCE. THIS CERTIFI- <br />CATION MAY BE MADE BY FORWARDING A CERTIFIED STATEMENT TO THE <br />DIVISION. <br />