Laserfiche WebLink
TR-24 EMD vent and State coal Mar. 1996 <br /> TR-25 Pond E design April 1996 <br /> Minor Revisions since Renewal No. 2 (June 1993) <br /> No. Description Date <br /> MR-86 Topsoil Pile SAE June 1993 <br /> MR-87 Facility changes May 1993 <br /> MR-SS 18" CMP near Pond F May 1993 <br /> MR-89 Topsoil pile stabilization June 1993 <br /> MR-90 Tipple No. 2 geotech holes July 1993 <br /> MR-91 Material Storage areas July 1993 (denied) <br /> MR-92 Replace well 006-83-48c July 1993 <br /> MR-93 Two small structures Sept. 1993 <br /> MR-94 Material Disposal Areas Sept. 1993 <br /> MR-95 Washbay ramp modification Sept. 1993 <br /> MR-96 Move FCM #2 drill site Sept. 1993 <br /> MR-97 Subsidence report clarification Nov. 1993 <br /> MR-98 Replace well GWB-2 Dec. 1993 <br /> MR-99 Belt out back Dec. 1993 <br /> MR-100 Lower Trout creek water site Dec. 1993 <br /> MR-101 Delay waste pile construction Dec. 1993 <br /> MR-102 Site 109 rock filter Feb. 1993 <br /> MR-103 Mine SW District gateroads May 1993 <br /> MR-104 Aerator and tower bases July 1994 <br /> MR-105 Fish Creek borehole shed Aug. 1994 <br /> MR-106 Install pilings Sept. 1994 <br /> MR-107 Zero Entry vent shaft Sept. 1994 <br /> -3- <br />