Laserfiche WebLink
STIPULATION NO. 52 <br /> Prior to September 1, 1996 or before the longwall face advances no <br /> closer than 500 feet of the Hayden-Gore Pass powerline located in <br /> Section 21 T5N R86W, whichever is earlier, Twentymile Coal Company <br /> will submit documentation in the form of a letter from the Hayden - <br /> Gore Pass powerline owner(s) which clearly states that in the <br /> event subsidence causes a power line to sever, the end line power <br /> users would not be subject to power outage. This letter should <br /> also verify that in the event a line comes in contact with the <br /> ground, that ground fault interruption or a similar process would <br /> prevent electrocution to people and/or property. <br /> STIPULATION NO. 53 <br /> Prior to June 15, 1996 or before the longwall face advances no <br /> closer than 500 feet of the Southern Pacific Railroad track, <br /> Twentymile Coal Company will submit documentation in the form of a <br /> letter from Southern Pacific granting their approval and <br /> concurrence with the subsidence control plan for the railroad track <br /> where the track is located in those lands to be subsided. <br /> Section IV - Summary and Discussion <br /> This section consists of questions or comments raised as a result <br /> of the Division's review of the permit application and related <br /> materials. <br /> 1 . Map 29 "clouds" as described on page 2 .05-55 of the permit text <br /> apparently were inadvertently removed from Map 29 during MR-131 <br /> or an earlier revision. This designation was included to <br /> indicate that a particular topsoil pile was to be replaced <br /> solely on the particular area from which it was removed. Also, <br /> Pond E relocation does not show up accurately on the currently <br /> approved copy of Map 29. Possibly the wrong copy of Map 29 was <br /> inadvertently updated during one of the latest revisions. <br /> Please accurately add this information back to Map 29 as <br /> originally approved. <br /> 2 . Pond T topsoil pile is not included in the SAE text discussion <br /> on page 2 .05-28 . All approved SAE areas for the Foidel Creek <br /> mine should be included in this portion of the text and <br /> appropriate calculations should be included as part of <br /> Exhibit 8 . <br /> 3 . Some reclamation plan text is mixed in with the operation plan <br /> information (i .e. p. 2 .05-27 (b) ) . This information should be <br /> moved to the text which responds to the reclamation plan <br /> beginning on page 2 .05-54 (g) . <br /> 4 . Inspection of cross-sections depicted on Map 25 and the post- <br /> mining topography as depicted on Map 31 indicate some <br /> -9- <br />