My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53880
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:17 PM
Creation date
11/23/2007 9:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Name
BID FRUITA MINE AMERICAN SHIELD BOND FORFEITURE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRUITA MINE/AMERICAN SHIELD <br />BOND FORFEITURE PROJECT - M-81-015 <br />PKA-0-455 <br />PROJECT LOCATION <br />The Fruita Mine Project area is located approximately 10 miles north of Fruita in Mesa County, CO. <br />Situated in the Bookcliffs, the elevation of the work area is approximately 5,000 feet. The project <br />consists of one mine that has one area which will require reclamation work. <br />WORK SUMMARY <br />The area in which the project is located has been mined by underground methods creating an <br />overcast slope from a bench cut. The project consists of the construction of an erosionally stable <br />drainage way through the bench and slope areas. <br />PRE-BID MEETING AND SITE SHOWING <br />A mandatory pre-bid meeting and site showing will be held at the parking lot of the City Market in <br />Fruita on February 17, 2000 at 8:00 a.m. <br />The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site and vicinity. <br />Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid meeting for firms <br />to register their attendance. It is the bidder's responsibility to make certain their attendance is <br />recorded on the sign-in sheet. Failure to sign-in or to attend the entire meeting will be cause for <br />rejection of a bid. Contractors should be prepared to spend the entire day inspecting the sites that <br />are included in this bid package. <br />Bidders are cautioned that, notwithstanding any remarks or clarifications given at this meeting and <br />site showing, all terms and conditions of the contract documents remain unchanged unless they <br />are changed by written amendment issued by the OWNER. If the answers to questions, or any <br />amendment to the contract documents create ambiguities, it is the responsibility of the bidder to <br />seek clarification prior to submitting a bid. <br />BID OPENING DATE <br />The bid opening date for this project is March 2, 2000 at 2:30 p.m. <br />All bid openings are open to the public and bidders are welcome to attend and record the bid <br />results. A written tabulation of the Bid results will be available to those bidders who submit a <br />clearly-visible, self-addressed, stamped envelope with their bid. Please allow two weeks for receipt <br />of Bid results. Telephone requests cannot be honored because of time constraints. <br />BID SUBMITTAL <br />Sealed bids in single copy for the work described herein will be received until the date and time <br />specified above at the Colorado Division of Minerals and Geology, 1313 Sherman Street, Suite <br />215, Denver, Colorado 80203, and at that time publicly opened. <br />
The URL can be used to link to this page
Your browser does not support the video tag.