Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />NUC>_EAR DENSITY TEST RESULTS <br />Project: Haul Road Y-A Project No.: 95-2384 Date: 8/11/95 <br />Report No.: 2 <br />Test <br />Number Location Depth <br />Elevation Proctor <br />Number Dry <br />Density <br />(Pcf) Water <br />Content <br />(%) Actual <br />Compaction Required <br />Compaction <br />5 Sta. 0+75, 25' L of 6' BSG 1 103.3 15.8 97 90 <br /> CL <br />6 Sta. 1+20. 15' R of 8' BSG 99.9 15.5 93 " <br /> CL <br />7 Sta. 8+25, 10' L of 23' BSG 96.9 13.5 91 " <br /> CL <br />8 Sta. 8+50, 40' L of 22' BSG 98.4 14.8 92 " <br /> CL <br />9 Sta. 8+40, 18' R of 24' BSG 97.2 15.4 91 " <br /> CL <br />Proctor Data: <br />No.: 1 Maximum DD: 107.0 OMC: 16.5 Soil Type: Santly Clay <br />No.: Maximum DD: OMC: Soil Type: <br />No.: Maximum DD: OMC: Soil Type: <br />Comments: <br />BSG= Below Subgrade Grade NWC= Northwest Comer <br />SG= Subgrade Grade NEC= Northeast Corner <br />SBG= Subbase Grade SWC= Southwest Comer <br />BSBG= Below Subbase Grade SEC= Southeast Corner <br />BCG= Base Course Grade BFG= Below Footing Grade <br />BBF= Below Bottom of Footing FG= Footing Grade <br />