Laserfiche WebLink
<br />Number Stipulation Status <br />PEABODY COAL COMPANY MUST PROVIDE A DETAILED Modified, <br />DESCRIPTION OF THE MEASURES TO BE TAKEN DURING AND See MR No. 6 <br />AFTER MINING TO ENSURE PROTECTION OR MITIGATION OF <br />THE RIGHTS OF WATER USERS WHICH MAY BE ADVERSELY <br />AFFECTED BY MINING. THIS SHOULD BE SUBMITTED TO THE <br />DIVISION FOR APPROVAL WITHIN 60 DAYS OF PERMIT <br />ISSUANCE OR PRIOR TO ANY DISTURBANCE WITHIN THE MINE <br />PERMIT BOUNDARY. AT THE SAME TIME AS SUBMITTAL TO <br />THE DIVISION, PEABODY MUST SEND COPIES TO EACH OF <br />THE WATER RIGHT HOLDERS OF RECORD FOR COMMENT. <br />PRIOR TO DISTURBANCE THE APPLICANT SHALL SUBMIT Resolved, <br />VEGETATIVE INFORMATION FOR THE COMMUNITIES TO 8E 9/17!85 <br />DISTURBED DURING THE CONSTRUCTION OF THE TIE ACROSS <br />HAUL ROAD TO VERIFY THE COMPARABILITY OF VEGETATIVE <br />COMMUNITIES TO BE DISTURBED UNDER THE NEW PROPOSED <br />ALIGNMENT AND THOSE PROPOSED TO BE DISTURBED UNDER <br />THE OLD ALIGNMENT. <br />THE FOLLOWING ASPECTS OF THE SENECA II-W REYEGETATION <br />PLAN WILL BE IMPLEMENTED OR MODIFIED AS STATED BELOW: <br />A, THE USE OF ALFALFA AND PUBESCENT WHEATGRASS WILL (8A) Ongoing <br />NOT BE ALLOWED UNTIL SUCH TIME AS THE APPLICANT <br />DEMONSTRATES THROUGH SITE SPECIFIC DATA (BASED <br />ON SIMILAR SEEDING RATES AND METHODS) THAT THESE <br />SPECIES ARE BOTH DESIRABLE AND NECESSARY. <br />B. THE APPLICANT WILL SUBMIT AND HAVE APPROVED ALL (86) Ongoing <br />SUPPLEMENTAL SHRUB AND FORB COMPONENTS OF THE <br />SEED MIXES (SPECIES AND RATES). <br />WITHIN NINETY (90) DAYS OF PERMIT ISSUANCE THE (SC) Resolved, <br />PERMITTEE SHALL DEVELOP AND SUBMIT FOR DIVISION 7/15/86 <br />APPROVAL A REVEGETATION MONITORING PLAN FOR <br />RECLAIMED AREAS. THE PLAN SHALL ADDRESS METHODS <br />OF SAMPLING AND SAMPLING INTENSITY FOR YEARS 2, <br />4, AND 7 OF A REVEGETATED AREA FOR VEGETATIVE <br />COVER AND WOODY PLANT DENSITY. <br />9 PEABODY COAL COMPANY MUST DEMONSTRATE THAT Ongoing <br />BLASTING OPERATIONS WITHIN 500 FEET OF THE OIL WELL <br />WILL HOT DAMAGE THE INTEGRITY OF THE WELL CASING AND <br />DETAIL THE SAFETY PRECAUTIONS WHICH WILL BE UTILIZED <br />TO ENSURE THAT VENTED GAS IS NOT IGNITED. THIS <br />DEMONSTRATION MUST BE SUBMITTED TO THE DIVISION AND <br />APPROVED PRIOR TO ANY BLASTING ON SITE. <br />10 PEABODY COAL COMPANY MUST REVISE WITHIN THIRTY (30) Resolved, <br />DAYS OF PERMIT ISSUANCE THE PERMIT APPLICATION TO 7/15/86 <br />ADDRESS THE FINAL DISPOSITION OF CONTAINMENT DITCH <br />RECLAMATION. <br />-4- <br />