My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53165
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:48 PM
Creation date
11/23/2007 8:23:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
General Documents
Doc Date
9/1/1992
Doc Name
Invitation and Bid RN-Mines-302
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID ITEM 5: REVEGETATION <br />All areas disturbed during reclamation work will be revegetated according to <br />the Revegetation Specifications in the General Bid Specifications 1992. Seed <br />will be supplied by the OWNER. Either commercial fertilizer or manure are <br />acceptable for this project. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor <br />construction activities and ensure that each work item is completed and <br />constructed to design specifications. The PROJECT MANAGER will be available <br />during regular business hours (8:00 A.M. to 5:00 P.M.) on weekdays. <br />Inspections will not be scheduled on weekend days or holidays without prior <br />approval of the PROJECT MANAGER. The following items must be observed and <br />approved by the PROJECT MANAGER before proceeding with additional work: <br />Bedrock or footing anchoring of both bulkhead seals prior to course <br />work. <br />Initial waste-soil excavation and placement prior to utilizing <br />subsoils for the adit backfills. <br />Final grade prior to revegetation steps. <br />ADDITIONAL BID ITEM <br />Included on the Bid Schedule is an additional bid item. This bid item is not <br />guaranteed, and will be used only in the event that conditions change on site, <br />and only after approved by the PROJECT MANAGER. The additional bid item for <br />this project includes: <br />Bid Item 6: EQUIPMENT RENTAL <br />Additional track-hoe time using a CAT 215 hoe or equivalent is anticipated for <br />minor surface work and shrub transplanting after final grade over the reclaim <br />areas is achieved Equipment Rental Specifications as described in the <br />General Bid Specifications, 1992, will be adhered to except for horsepower <br />adjustment. No adjustment will be made if a larger hoe is to be used. Total <br />hours are not guaranteed and are only included after approved by the PROJECT <br />MANAGER. <br />MVC/yjb <br />4489E <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.