My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53094
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:45 PM
Creation date
11/23/2007 8:19:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
6/23/1994
Doc Name
CRESSON PROJECT PN M-80-244 COMMITMENT 33 SPECIFICATIONS DIVERSION DITCH GEN LAYOUT& DESIGN
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ ' ~ ~ III III I II1111111 III <br />//~`^/'`~' Cripple Creek & Victor Gold Mining Company 999 <br />\1 l\ A Jant Ven\ure - Prkes Peak Mining Company. Manager <br />~~ Operations Oflice Englewood Office <br />P.O. Box 191, 2755 State Highway 67 5251 DTC Parkway, Suite 700, Englewood <br />Victor, Colorado 80860 Colorado 80111 <br />(719) 669-2977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 689-0707 <br />June 21, 1994 <br />.M. <br />SENT BY OVERNIGHT MAIL -CERTIFIED RETI,JjtN RECEIPT REQjTESTED <br />~1s, ,,;.~F-~. <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />JUN 2 3 1994 <br />~rV:L:Ofr ['; j,,;.n,nr ^I~ n laCa py <br />Reference: Cresson Proiect: Permit Number M-80-244: Commitment Number "33" <br />(Specifications) -Diversion Ditch General Layout and Design. <br />Dear Mr. Keffelew: <br />Pursuant to the approved application for Amendment Number 6 to the subject permit and Cripple <br />Creek & Victor Gold Mining Company's ("CC&V") commitment number "33" thereto, the <br />following additional information and request for concurrence is presented to the Office of Mined <br />Land Reclamation by CC&V. Commitment number 33 reads: <br />3.3. "Design and specification changes, as defined in Section 6.05 of the CQA plan and <br />technical specifications, shall only be made with written agreement of the OMLR. " <br />On June 1, 1994, while your Office staff met with us at the "pre-construction meeting," you <br />briefly reviewed the issue of modifying the diversion channel system immediately upgradient of <br />Stale Highway 67. Later you traversed the proposed route in the company of representatives <br />from Golder Associates. This letter transmits the final hydraulic design computations along with <br />the basin delineation map for your review and concurrence. <br />This design, which involves minor relocation of the primary diversion ditch located upgradient <br />of Highway 67, does eliminate the culvert under Highway 67 on the east side of the Project Area <br />and instead routes the flow into the larger box culvert at the west end of the Project area. More <br />specifically, the southeast subbasins (S1F, S2F, and S3F routing in channels 10 and 11 are <br />modified. The diversion that routed flow into the Wilson Creek drainage is now changed to <br />route flow back into Arequa Gulch over to the box culvert under Highway 67 that has always <br />been planned for west of the Carlton Mill. These modifications appeared desirable based on <br />field reconnaissance. Channels 16 and 4 are involved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.