Laserfiche WebLink
-5- <br />- Dozer Track' tan This may or may not be a revision. If <br />'e ~ continued dozer tracking is to be used <br />- as an erosion control measure, it <br />should be included in the Topsoil <br />C ~ '~" ~ Redistribution Section. <br />~ Haul Road Culvert Relocation The location of this culvert (4-9) <br />~~ C.U~V21`r jtt!, (i1 ~,v~1f1~- mapuld be changed on the mining plan <br />h~T n~~C ~ ~~ dec Q, <br />Topsoil Storage The additional topsoil pile should be <br />added to the Mining P1 an Map. <br />MR-06 Mon~rin Plan Site SW-3 should be added to the <br />~12.r~ ~,~- ~ ~ (9 ~ ~C~ 1h~v~~i~tori~yyP~~ W'h~. <br />TR-01 Pit 4 Haul Road The haul ra'dd discussion in the permit <br />`;~~~yc ~ ~>r ?;r~~';~`? ~S -r~Gt'v~2~G~2C`-shoul d be reviewed to i nsure that all <br />relevant information is inc]uded. <br />~C~' ~j~~Yri~~ ~~L'~Ley-' <br />~ ~ _ Correspondence from the original <br />\,.~','~C_~ revision includes topsoi 1 salvage and <br />four addenda. In addition, a Letter <br />~iC'. (~-~ dated July 17; 1983; from Hydro - <br />~~~ ~~ Triad, indicates some minor variation <br />/1 from the design due to field <br />~~~1 V constraints. These changes should be <br />reflected in the permit: Lastly, the <br />original Hydro-Triad report (June 1981) <br />should be referenced. <br />TR-02 Hydrology Monitoring Reduction <br />Incorporate as previously noted in Section III of this report. It should be <br />noted that as per this revision an annual hydrology report is required to be <br />submitted by December 31 of each year. This report should also include the <br />quarterly inspections of sediment ponds: <br />VII. Stipulation and Joint Settlement Commitments <br />Dl vision records show nine joint settlement agreements and three permit <br />stipulations, all of which are either ongoing or have been satisfied. In many <br />cases the commitments Contained therein have been incorporated into the permit <br />narratives. In other cases the information was submitted as adequacy <br />responses and placed in the rear of chapters. These are dealt with in Section <br />III of this report and therefore will not be restated here. Two commitments <br />require specific comments, as follows: <br />~~~,~~~ ~ ~~ a) <br />J ~ ~~ ~~~~ <br />Joint settlement agreement 8 involved reclamation of the sediment <br />ponds at Pits 2; 3 and 4: A letter of December 7; 1984 (with <br />cross-sections) is referenced: The Rockcastle company must insert <br />the backfilling plans for these ponds into the permit. These plans <br />must clearly show the source of all fill materials: `.,~ 1~ <br />Za: 3 ~ n OccT~ l-z, (~ ~( t~e:~-r'h ~fC~~'~- V~`'~ p,~cF~ ~'~ ~ <br />~~ ~~~~~ ~j ~ ~5~~~~ <br />2~ <br />