Laserfiche WebLink
of Vol. I, (4.05.2(3)(b)(i)). <br />B. Surface and Ground Water Monitoring <br />The applicant will conduct monitoring of ground water in a manner approved by the <br />Division. The ground water monitoring plan can be Found in Exhibit 14, Vol. II-B of the <br />permit document (4.05.13(1)). <br />2. The applicant will conduct monitoring of surface water in a manner approved by the <br />Division. The surface water monitoring plan can be found in Exhibit 14, Vol. 11-B of the <br />permit document. NPDES monitoring is conducted under many permits for the Foidel <br />Creek mine as per the following: <br />POND OUTFACE SITE NPDES PERMIT NO. <br />E (FCT) 001 62 CO-0036684 <br />FC Borehole 001 (l5 CO-0042161 <br />Waste wtr 002 N/A " <br />B 003 63 CO-0027154 <br />C 004 82 .. " <br />D 005 84 " <br />E 006 85 " <br />F 007 87 " <br />C 008 55 " <br />r o02 so <br /> CO-0027154 <br />EMD Borehole 020 <br />The Division has reviewed the surface and groundwater monitoring plans as part of the revision process. <br />These monitoring plans are adequate to allow identification of impacts if any should develop (4.05.13(2)). <br />IV. Tospoil <br />Replaced soils that were stockpiled will be chisel plowed in addition to contour furrowed. These soils will <br />be drill seeded as soon as practicable following topsoil replacement. Stockpi{ed topsoil not utilized at <br />Energy Mine No. 3 has been transferred to the Foidel Creek permit for distribution at the Fish Creek <br />Tipple. <br />An alternative treatment to eliminate slippage surfaces, relieve compaction, and provide for root <br />penetration is approved. This treatment will consist of chisel plowing (4.06.4(1)). <br />V. Sealing of Drilled Holes and Underground Openings <br />The Division will require that each hole, well or other underground opening be capped, sealed, backfilled, <br />or otherwise properly managed (4.07.3). <br />Vf. Use of Explosives <br />C:U N 8\C82056\RN03\RN03F I N D.doc <br />22 <br />