My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52922
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:38 PM
Creation date
11/23/2007 8:08:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
1/12/1994
Doc Name
AMENDMENT 1 TO RN-MINES-322 GEC/EAST PIT COAL RECLAMATION PROJECT
From
DMG
To
ALL CONTRACTORS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />extreme south end of the East Pit shall not be disturbed or <br />regraded. Grading shall proceed from where the highwall <br />commences on the extreme south end of the East Pit and extend <br />north into the pit. Please note that the large size maps do <br />show this undisturbed drainage area to require grading which <br />is not the case. <br />The compaction requirements outlined in paragraph 2 must be <br />followed provided it can be done safely. <br />9. In reference to Task 12-East Pit Permanent Channel <br />Reconstruction Scope of Work, Work Description and Measurement <br />and Payment shall be modified to include the following; the <br />Scope of Work is to establish a permanent channel <br />reconstruction down the length of the East Pit as shown on the <br />attached Map 7 and cross sections on Drawings 2-4. This task <br />is broken into four parts: 12a) Approximately 150 linear <br />feet of channel constructed with erosion mat only, 12 b) <br />Approximately 250 linear feet of channel installed with <br />erosion control mat and riprap (flat sided on site rock). <br />12c) Approximately 2200 linear feet of channel constructed <br />without erosion mat. 12d) 15 drop structures constructed on <br />150 foot centers or as specified by the OWNER within the 2200 <br />feet of channel constructed without erosion mat. <br />The work description shall include 12d) DROP STRUCTURES. The <br />description of drop structure construction is hereby moved <br />from 12c to 12d for ease in bidding. <br />The measurement and payment for task 12 will be for the actual <br />number of linear feet of permanent channel reconstruction for <br />the unit price bid under Items 12a, 12b and 12c. on the Bid <br />Schedule. Item 12d shall be for the actual number of drop <br />structures constructed for the unit price bid. <br />10. The full sized GEC East Pit and Chen's Hill Final Contour and <br />Existing Contour Maps which were handed out at the pre-bid are <br />hereby incorporated into the Invitation and Bid by reference. <br />11. In reference to Task 13-East Pit Topsoil Replacement Work <br />Description shall be modified to include the following; the <br />topsoil and overburden growth medium must be replaced evenly <br />to a depth of 6 inches over the entire disturbance or to the <br />extent of the available soil. In the event of insufficient <br />soils, the PROJECT MANAGER shall indicate the areas to receive <br />topsoil replacement. <br />12. In reference to Task 15 and 16-Equipment Rental scope of work, <br />work description and measurement and payment shall be modified <br />to include the following equipment; <br />Item 17. 24 hours of loader time, with operator, 966F <br />Loader with a 5 yard bucket or equivalent 220 FHP <br />machine. <br />Item 18. 24 hours of truck time, with operator, 20 cubic <br />
The URL can be used to link to this page
Your browser does not support the video tag.