My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52922
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:38 PM
Creation date
11/23/2007 8:08:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
1/12/1994
Doc Name
AMENDMENT 1 TO RN-MINES-322 GEC/EAST PIT COAL RECLAMATION PROJECT
From
DMG
To
ALL CONTRACTORS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ~ ~II I~~I~~~I~~~~I ~~~ <br />~~. <br />.-1. <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51 , Room 215 <br />Denver, CO 80203 <br />Phone 1303) 866-3567 <br />FAX: (3031 832 8106 <br />January 12, 1994 <br />TO: All Contractors Bidding on the GEC\East <br />Reclamation Project (RN-MINES-322) <br />FROM: Jim McArdle, Senior Reclamation Specialist, <br />Minerals and Geology <br />oF' cow <br />~~~ a~ <br />~ R . <br />Re` <br />~ ~8 Z6 ~ <br />Roy Romer <br />Governor <br />hLChae10 Long <br />Division DlreUOr <br />Pit Coal <br />Division of <br />RE: Amendment Number 1 to RN-Mines-322, GEC\East Pit Coal <br />Reclamation Project <br />Thank you for your interest and attendance to the GEC\East Pit Coal <br />Reclamation Project pre-bid meeting held on January 11, 1994. The <br />following clarifications and amendments should be incorporated into <br />the Invitation and Bid document. <br />While blasting has not been specifically addressed in this bid <br />document, it will be acceptable to incorporate it into the <br />overall earth moving plan provided that the CONTRACTOR <br />receives prior approval from the OWNER by providing the OWNER <br />with a detailed blasting plan together with evidence that the <br />necessary permits and insurance have been obtained. A primary <br />concern is the close proximity of an active coal mine <br />facility. <br />In reference to Task 2-Chen's Hill Reduction Scope of Work and <br />Work Description shall be modified to include the following; <br />the road around Chen's Hill will not be eliminated. The <br />CONTRACTOR may move the road slightly closer to the fence, if <br />possible, to gain a few extra feet for the outslope reduction <br />and drainage ditch number 1. <br />On the east side of Chen's Hill, if the CONTRACTOR determines <br />that it is necessary to cover some previously reclaimed areas <br />to economically achieve the outslope grading requirements, <br />then the CONTRACTOR must first strip and stockpile existing <br />topsoil for later replacement. <br />In reference to Task 4-Chen's Hill Topsoil Replacement Work <br />Description shall be modified to include the following; the <br />topsoil and overburden growth medium which is located in the <br />topsoil stockpile located above the drainage on the east side <br />of Chen's Hill and the two stockpiles located on the north <br />side of Chen's Hill must be evenly replaced on the outslopes <br />having a finished grade to a depth of 6 inches. Outslopes <br />adjacent to the road around Chen's Hill is of primary concern. <br />
The URL can be used to link to this page
Your browser does not support the video tag.