My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52901
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:37 PM
Creation date
11/23/2007 8:08:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
General Documents
Doc Date
7/9/2004
Doc Name
Stipulations to the Permit
From
Holcim (US) Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i ~ II! IIIllllillllllll <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Oeµmmem of NaWral Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80103 <br />Phone U031866-3567 <br />Fn%:130318328106 <br />May 3, 1994 <br />DEPARTMEM OI <br />NATURAI <br />RESOURCE` <br />R°Y Romer <br />Paul Thomsen cm""°' <br />Holnam, Inc. .e~5alarar <br />P .O. BOX 2227 [x°awne Dueaw <br />~+smbael B. L°n~; <br />Ft Collins, CO 80522 oi.~.,w, OireUOi <br />Re: Slab Canyon Quarry, Revisior. Approval, Permit No. M-77-347, ReYision <br />No. AM-001 <br />Dear Mr.Thomsen: <br />On April 28, 1994 the Colorado Mined Land Reclamation.Board conditionally <br />approved the amendment application submitted to the Division on May 2E, 1993, <br />addressing the increase in acreage and changes in the reclamation plan. The <br />terms of the Amendment No. 001 approved by the Board are hereby incorporated <br />into Permit No. M-77-347. <br />The conditions of the Board approval are noted belo++. Please note that all <br />other provisions of Permit No. M-77-347 remain in full force and effect. <br />/ Stipulation No. O1 <br />INSTALL AT LEAST ONE DEMONSTRATION TREE PAD ON THE EXISTING PERiNIT <br />BEFORE PHASES II OR III ARE DISTURBED. THE TREE PAD WILL BE INSTALLED, <br />TOPSOILED, AND PLANTED NO LATER TNAN JULY 31, 1994 ANO BE NO LESS THAN <br />16 FEET BY BO FEET (OR EQUIVALENT AREA). <br />THE BOARD DIRECTED THE DIVISION TO WORK WI TN THE OPERATOR TO SELECT THE <br />MOST APPROPRIATE LOCATION FOR THE DEMONSTRATION TREE PAD, AND TO <br />DESIGNATE A LOCATION IF A CONSENSUS WAS NOT ACHIEVED. <br />Stipulation No. 02 <br />TOPSOIL AND SANDY OVERBURDEN STOCKPILE AREAS WILL BE DESIGNATED ON THE <br />MINING PLAN MAP, EXHIBIT C, BEFORE ANY PART OF PHASES 2 AND 3 Af;E <br />DISTURBED. SUCH DESIGNATION MUST 8E IN THE FORMAT OF A REVISIbN TO THE <br />PERMIT. <br />Stipulation No. 03 <br />THE SPECIFIC AMOUNTS OF GROWTH MEDIUM NECESSARY i0 COMPLETE RECLAMATION <br />OF PHASE I WILL BE SUBMITTED TO THE DIVISION NO LATER THAN <br />MAY 31, 1994. THIS MATERIAL WILL EITHER BE STOCKPILED ON-SITE LNTIL IT <br />IS USED FOR RECLAMATION ACTIVITIES OR THE OPERATOR CAN POST THE <br />NECESSARY BOND FOR HAULING SUFFICIENT MATERIAL IN FROM OFF-SITE. <br />STOCKPILING GROWTH MEDIUM OR POSTING SUFFICIENT BOND MUST OCCUR ON OR <br />BEFORE JULY 15, 1994. <br />
The URL can be used to link to this page
Your browser does not support the video tag.