d) Measurement and Payment <br />There shall be no measurement for payment. Payment for this task will be <br />reflected in a lump sum bid under Item 3 of the Bid Schedule. This lump <br />sum bid will include all payment for excavation, transport and <br />backfilling of overburden and subsoil into strip-pits, and final grading <br />according to the above specifications. Payment will be as the work <br />outlined above is completed and approved by the PROJECT MANAGER. Payment <br />for this task shall be mane only for that amount shown under Item 3 on <br />the Bid Schedule. All incidental costs shall be reflected in each Bid <br />Item or shall be incurred at the CONTRACTOR's expense. <br />TASK 4 Sediment Pond Improvement <br />a) Improvement of Pond B <br />Pond B is an existing sediment control containment with rough dimensions <br />of 200 feet X 50 feet (See Drainage Plan). A two feet (2') high concrete <br />structure at the northeast end of the pond will continue to be used as <br />the dam for this pond. The CONTRACTOR will dress out the bottom and <br />sides of this sediment pond to stabilize the banks and to increase the <br />holding capacity by the removal of bottom irregularities. The pond will <br />remain at current dimensions and will not require the addition or renaval <br />of any appreciable quantity of earth. The PROJECT MANAGER will provide <br />reference stakes to delineate the perimeter of the pond. The CONTRACTOR <br />will profile pond walls at a slope of 2:1 (h orizontal:vertical) from <br />provided perimeter stakes. <br />b) Adjustable Crest Gate <br />In addition, the CONTRACTOR will install an adjustable crest gate into <br />the spillway crest notch in the existing Pond B dam. The adjustable <br />crest gate will be constructea of flashboaras ~+hich can be placed or <br />removed into angle-iron guides. The angle iron guides shall be concrete <br />bolted or ramset into the spillway crest notch. The dimensions of the <br />adjustable crest gate are two and one-half feet (2 1/2') in width by two <br />feet (2') in height. The CONTRACTOR shall supply all material for the <br />construction and installation of the adjustable crest gate. <br />c) Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be <br />reflected in a lump sum bid under Item 4 of the Bid Schedule. Payment <br />for Pond B improvements, including installation of the aojustable crest <br />gate, will be as the work is completed and approved by the PROJECT <br />MANAGER. All costs, including materia]s and incidentals, to dress out <br />sediment Pond 8 and for the construction of the adjustable crest gate <br />will be reflected in this or other Bid Item's or shall be incurred at the <br />CONTRACTOkS expense. <br />-y- <br />