Laserfiche WebLink
Permit ~Jumber CO-0068, ( ) <br />Page 2 of 7 <br />- Bear ¥3 Township 13 South, Range 90 4Jest, 5th P.M. <br />Section 17, SE1/4, S1/2 of NE1/4, NE1/4 of the PJE1/4 <br />Sec. 3 This permit is issued for a period of 5 years commencing on the <br />date signed by the permittee, except that this permit will <br />terminate if the permittee has not begun *. he surface coal mining <br />and reclamation operations covered herein within 3 years of date of <br />issuance. <br />Sec. 4 This permit may be renewed upon expiration for areas ~.rithin the <br />boundaries of the existing permit in accordance with the Act, the <br />approved Colorado State Program and the Federal Lands Program <br />promulgated by the Secretary of the Interior at 30 CFR Chapter `J ii <br />Subchapter D. <br />Sec. 5 This permit may not be transferred, assigned, or rights under this <br />permit sold without the approval of the Director, Office of Surface <br />Mining, in accordance with 30 CFR 788.18. <br />Sec. 6 The permittee shall allow the authorized representatives of the <br />Secretary, including, but not limited to, inspectors and fee com- <br />pliance officers, o-~ithout advance notice or a search warrant, upon <br />presentation of appropriate credentials, and without delay to: <br />a. Have the rights of entry provided. for in 30 CFR 840.12 and <br />~ 842.13; and, <br />b. Be accompanied by private persons for the purpose of conducting <br />an inspection in accordance with 30 CFR 842, when the inspec- <br />tion is in response to an alleged violation reported by the <br />private person. <br />Sec. 7 The permittee shall conduct surface coal mining and reclamation <br />operations only on those lands specifically designated as within <br />the permit area on the maps submitted in the complete application <br />and approved for the term of the permit and which are subject to <br />the performance bond. <br />Sec. 8 The permittee shall take all possible steps to minimize any adverse <br />impact to the environment or public health and safety resulting <br />from noncompliance with any term or condition of the permit, in- <br />cluding, but not limited to: <br />a. Any accelerated or additional monitoring necessary to determine <br />the nature and extent of noncompliance and the results of the <br />noncompliance; <br />b. Imediate implementation of measures necessary to comply; and <br />c. Warning, as soon as possible after learning of such noncompli- <br />ance, any person whose health and safety is in imminent danger <br />/"1 due to the noncompliance. <br />lZ. Ill ~~~ . ;~. i <br />