My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52645
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:27 PM
Creation date
11/23/2007 7:55:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
9/27/1999
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I -INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the midterm permit review of Colorado Yampa Coal <br />Company's Energy Mine No. 1 and Eckman Park Mine. The Colorado Division of Minerals <br />and Geology ("Division") conducted this review for the purpose of fulfilling the <br />requirements of the Colorado Surface Coal Mining Reclamation Act ("Act"), and the <br />Regulations of the Colorado Mined Land Reclamation Board for Coal Mining <br />("Regulations"). Energy Mine No. 2 previously was also a part of permit C-81-071, but the <br />Division's jurisdiction over Mine No. 2 ended on March 30, 1998 when a final bond release <br />was approved. <br />Oreanization of this Document <br />This document is divided into the following three parts: <br />Part I -Introduction <br />Part II-Summary of Operations, Violations, Revisions to Permit, <br />Stipulations, Vaziances, and Bond <br />Part III -Requested Revisions of Permit Application <br />Midterm Review Requirements of the Retrttlations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br />mining and reclamation permit prior to the middle of the permit's tent[ (2'/z years). Based <br />on this midterm review, for good cause shown, the Division may require the permittee to <br />revise or modify the permit in order to ensure compliance with the Act and Regulations. <br />The table below lists the other Sections of the Regulations that require a midterm review of <br />specific aspects of each permit. <br />Specific midterm review topics <br />Section Topic <br />Applicability at Eckman Park Mine and <br />Mine No. 1 <br />2.06.2(10) Experimental practices <br />2.06.3(4)(a) Mountaintop removal <br />variances <br />Mine No. 1 and Eckman Park Mine <br />Midterm Review <br />Inapplicable, no such practices. <br />Inapplicable, no such vaziances. <br />Page 2 September 27, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.