Laserfiche WebLink
-7- <br />The operator has recalculated all reclamation costs. Equipment <br />productivity was estimated from the CAT Handbook, equipment rental <br />rates were based on the CRG Guide, and demolition costs were <br />calculated using Means Construction Cost Data. Revegetation costs <br />were based on actual costs incurred at the mine. <br />The bond amount for the Colowyo mine, including administrative costs, <br />is set at 58,747,405.00. <br />XX. Seeding of Dri11_ed Holes and Underground Openings - Rules 2.05.4(2)(8) <br />a~ <br />The mine is in compliance with the requirements of this section. <br />XXI. Special Cate ories of Mining Other Than AVF and Prime Farmland - <br />Ru es an <br />In the original permitting process, Streeter Fill was considered an <br />experimental practice. In addition, two stipulations were written <br />(Stipulation No.'s 6 and 7) concerning monitoring of the fill. In <br />1986 a technical revision was approved to change Streeter Fill to an <br />excess overburden pile built under alternative design standards. The <br />reader is referred to Section 2.06.2 for a complete discussion of this <br />history. Monitoring in accordance with Stipulations 6 and 7 has <br />continued. The Stipulation commitments were incorporated into the <br />permit in the renewal process. Monitoring data may be found in the <br />annual reports. <br />The remaining special categories do not apply to this operation. <br />9967E <br />/1 al <br />