My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL52490
DRMS
>
Back File Migration
>
General Documents
>
GENERAL52490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:21 PM
Creation date
11/23/2007 7:46:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
General Documents
Doc Date
5/29/2003
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Schedule <br />Revegetation is scheduled immediately following redistribution of soil. This will normally be <br />during the fall between August 15 and November 15. <br />C. Irrigation <br />No irrigation is anticipated to be employed during revegetation at the Carbon Junction Mine. <br />D. Weed and Pest Control <br />Noxious weeds will be controlled on the revegetated azeas of the mine site. Upon identification <br />of an infestation, OEI will implement control measures. Control measures will be implemented <br />based on recommendations ofthe local NRCS or agricultural extension office. OEI will modify <br />the permit as necessary to address the measures to be implemented. <br />E. Fertilization <br />Soils will be tested after respreading and prior seeding to determine the necessity of applying <br />fertilizer. Fertilization rates will be based on the recommendations of the local NRCS or <br />agricultural extension office and will reflect the nutrient requirements of the species in the seed <br />mix. Fertilization may be delayed up to three growing seasons after initial planting to minimize <br />weed growth in the reseeded azeas. <br />Revegetation Success Criteria <br />The criterion for evaluation of revegetation success for the approved post-mining land use is <br />vegetation cover. This vegetation cover must be sufficient to control erosion. Based on <br />sampling at other mines sites in the azea and the pre-mining vegetation studies, a revegetation <br />cover standazd was established. The following will be the revegetation success criteria for the <br />Carbon Junction Mine: <br />1. Vegetation Cover <br />Vegetation cover of the reclaimed area will be successful when vegetation cover is 90 percent <br />of the cover standard of 40 percent with 90 percent statistical confidence. <br />2. Herbaceous Production <br />There is no herbaceous production revegetation success standazd. <br />3. Woody Plant Density <br />There is no woody plazit density revegetation success standazd. <br />4. Species Composition <br />There is no species composition revegetation success standard. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.